Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2639 E BROADWAY BL
Apply Date:
11/18/2024
Applicant:
Arturo Zatarain
Description:
ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.

Permit Reviews

Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Start Date Submittal Complete Date Status  
09/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/03/2025 APPROVED Review Details
01/14/2025 RESTAMP - COMMERCIAL v.1 01/19/2025 APPROVED Review Details
12/20/2024 COMMERCIAL REVIEW - FULL v.2 01/14/2025 APPROVED Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/28/2025 APPROVED Review Details
11/21/2024 COMMERCIAL REVIEW - FULL v.1 12/16/2024 REQUIRES RESUBMIT Review Details
08/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/04/2025 APPROVED Review Details
08/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Date Description Comments
12/05/2024 AIR BALANCING REPORT IS REQUIRED.
01/19/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/21/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/05/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
11/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/05/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permite Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/09/2025 COT - BULD - SWG Clearance N/A Not Applicable
08/25/2025 BULD - Electrical Clearance N/A Not Applicable
08/25/2025 ENGR Engineering Final N/A Not Applicable NO exterior work
08/25/2025 COT - LCBU - Roof Nailing N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/23/2025 COT - LCEL - Electrical Underground Passed
04/23/2025 COT - LCPL - Rough Soil Passed
04/29/2025 COT - LCBU - Preslab Passed Ok to place concrete in progress areas.
04/29/2025 COT - LCEL - Grounding/Bonding Passed
05/27/2025 COT - LCBU - Framing Passed
05/27/2025 COT - LCEL - Electrical Above Ceiling Passed
05/27/2025 COT - LCME - Mechanical Intermediate Passed
05/27/2025 COT - LCEL - Electrical Intermediate Passed
06/09/2025 COT - LCPL - Plumbing Intermediate Passed
08/25/2025 COT - LCEL - Electrical Final Passed
08/25/2025 COT - FCON - Fire - Final Passed
08/25/2025 COT - LCME - Mechanical Final Passed
08/25/2025 COT - LCPL - Plumbing Final Passed
08/26/2025 TRSP - ROW - Final/Close-Out Passed
08/25/2025 COT - LCEL - Outdoor Lighting Passed
08/25/2025 COT - LCBU - Building Final Passed