Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1124-02215
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2639 E BROADWAY BL
Address NEW:
2639 E BROADWAY BL
Apply Date:
11/18/2024
Applicant:
Arturo Zatarain
Description:
ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Permit Reviews
Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2025 | APPROVED |
| 01/14/2025 | RESTAMP - COMMERCIAL v.1 | 01/19/2025 | APPROVED |
| 12/20/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/14/2025 | APPROVED |
| 01/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/28/2025 | APPROVED |
| 11/21/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/16/2024 | REQUIRES RESUBMIT |
| 08/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/04/2025 | APPROVED |
| 08/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
| Date | Description | Comments |
|---|---|---|
| 12/05/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 01/19/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/21/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 12/05/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
| 11/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/05/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permite Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/25/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 08/25/2025 | ENGR Engineering Final | N/A | Not Applicable | NO exterior work |
| 08/25/2025 | COT - LCBU - Roof Nailing | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 04/23/2025 | COT - LCPL - Rough Soil | Passed | ||
| 04/29/2025 | COT - LCBU - Preslab | Passed | Ok to place concrete in progress areas. | |
| 04/29/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 05/27/2025 | COT - LCBU - Framing | Passed | ||
| 05/27/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 05/27/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 05/27/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 06/09/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 08/25/2025 | COT - LCEL - Electrical Final | Passed | ||
| 08/25/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/25/2025 | COT - LCME - Mechanical Final | Passed | ||
| 08/25/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 08/26/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/25/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 08/25/2025 | COT - LCBU - Building Final | Passed |