Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2639 E BROADWAY BL
Apply Date:
11/18/2024
Applicant:
Arturo Zatarain
Description:
ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.

Permit Reviews

Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Start Date Submittal Complete Date Status  
09/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/03/2025 APPROVED Review Details
01/14/2025 RESTAMP - COMMERCIAL v.1 01/19/2025 APPROVED Review Details
12/20/2024 COMMERCIAL REVIEW - FULL v.2 01/14/2025 APPROVED Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/28/2025 APPROVED Review Details
11/21/2024 COMMERCIAL REVIEW - FULL v.1 12/16/2024 REQUIRES RESUBMIT Review Details
08/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/04/2025 APPROVED Review Details
08/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1124-02215
Permit Status: Complete
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Date Description Comments
12/05/2024 AIR BALANCING REPORT IS REQUIRED.
01/19/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/21/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/05/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
11/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/05/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permite Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/09/2025 COT - BULD - SWG Clearance N/A Not Applicable
08/25/2025 BULD - Electrical Clearance N/A Not Applicable
08/25/2025 ENGR Engineering Final N/A Not Applicable NO exterior work
08/25/2025 COT - LCBU - Roof Nailing N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02215
Permit Description: ACAI BRASIL - Tenant improvement to an existing commercial building. The building will remain as it is with no additional square footage added. Use will be a restaurant.
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/23/2025 COT - LCEL - Electrical Underground Passed
04/23/2025 COT - LCPL - Rough Soil Passed
04/29/2025 COT - LCBU - Preslab Passed Ok to place concrete in progress areas.
04/29/2025 COT - LCEL - Grounding/Bonding Passed
05/27/2025 COT - LCBU - Framing Passed
05/27/2025 COT - LCEL - Electrical Above Ceiling Passed
05/27/2025 COT - LCME - Mechanical Intermediate Passed
05/27/2025 COT - LCEL - Electrical Intermediate Passed
06/09/2025 COT - LCPL - Plumbing Intermediate Passed
08/25/2025 COT - LCEL - Electrical Final Passed
08/25/2025 COT - FCON - Fire - Final Passed
08/25/2025 COT - LCME - Mechanical Final Passed
08/25/2025 COT - LCPL - Plumbing Final Passed
08/26/2025 TRSP - ROW - Final/Close-Out Passed
08/25/2025 COT - LCEL - Outdoor Lighting Passed
08/25/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CHLORINATION TEST-2025-08-24_V1.PDF DOCUMENTS VIEW
BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-ACAI BRASIL-SOLOT PLAZA_V2.PDF DOCUMENTS VIEW