Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1124-02205
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8110 S HOUGHTON RD UNIT 162
Address NEW:
8110 S HOUGHTON RD UNIT 162
Apply Date:
11/15/2024
Applicant:
Joey Fimbres
Description:
Interior demo and refurbish to vanilla shell space
Permit Reviews
Permit Number - TC-COM-1124-02205
Permit Status: Complete
Permit Description: Interior demo and refurbish to vanilla shell space
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/15/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 12/10/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02205
Permit Status: Complete
Permit Description: Interior demo and refurbish to vanilla shell space
| Date | Description | Comments |
|---|---|---|
| 11/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02205
Permite Description: Interior demo and refurbish to vanilla shell space
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| COT - FCON - Alarm - Final | N/A | Not Ready | ||
| 01/10/2025 | COT - FCON - Fire - Final | N/A | Re-inspection required | Sprinklers coverage needs to be evaluated by licensed contractor. Several heads are to close together after wall demo. Em lights need to be repaired, ceiling not intact, electrical outlet covers missing and a fire extinguisher needs to be mounted on the wall. |
| 01/10/2025 | COT - LCBU - Building Final | N/A | Re-inspection required | 1/10/25: revision required for changes made (in-fill removed, circuits added to office area, Hard lid at office has been covered prior to any framing inspection on hard lid area, cleanout covered at existing shower in office area), fire inspection must be passed prior to building final. Cover plates and all receptacles must be installed, grid ceiling must be complete. |
| 01/10/2025 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 1/10/25: revision required for changes made (in-fill removed, circuits added to office area, Hard lid at office has been covered prior to any framing inspection on hard lid area, cleanout covered at existing shower in office area), fire inspection must be passed prior to building final. Cover plates and all receptacles must be installed, grid ceiling must be complete. |
| 01/10/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 1/10/25: revision required for changes made (in-fill removed, circuits added to office area, Hard lid at office has been covered prior to any framing inspection on hard lid area, cleanout covered at existing shower in office area), fire inspection must be passed prior to building final. Cover plates and all receptacles must be installed, grid ceiling must be complete. |
| 01/10/2025 | COT - FCON - Sprinkler - Final | N/A | Re-inspection required | Sprinklers coverage needs to be evaluated by licensed contractor. Several heads are to close together after wall demo. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02205
Permit Description: Interior demo and refurbish to vanilla shell space
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | COT - FCON - Fire - Final | Passed | ||
| 02/13/2025 | COT - LCBU - Building Final | Passed | 2-13-25, building final approved. | |
| 02/13/2025 | COT - LCEL - Electrical Final | Passed | 2-13-25, electrical final approved. | |
| 02/13/2025 | COT - LCPL - Plumbing Final | Passed | 2-13-25, plumbing final approved. | |
| 02/13/2025 | COT - FCON - Sprinkler - Final | Passed |