Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - LCEL - Electrical Final 

Permit Number - TC-COM-1124-02205

Inspection Description - COT - LCEL - Electrical Final 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/10/2025 COT - LCEL - Electrical Final  Re-inspection required 1/10/25: revision required for changes made (in-fill removed, circuits added to office area, Hard lid at office has been covered prior to any framing inspection on hard lid area, cleanout covered at existing shower in office area), fire inspection must be passed prior to building final. Cover plates and all receptacles must be installed, grid ceiling must be complete.
01/23/2025 COT - LCEL - Electrical Final  Re-inspection required 1-23-25, see previous inspection notes regarding revisions/requirements, and updated floor plan. Additional items required: provide access to electrical panel, ladder to inspect above ceiling, install light fixture/cap exposed electrical wires in bathroom.
02/13/2025 COT - LCEL - Electrical Final  Passed 2-13-25, electrical final approved.