Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/22/2023
Applicant:
Dick Stover
Description:
construction documents for a 1489 sf expansion of a 3468 sf existing medical office in an existing building

Permit Reviews

Permit Number - TC-COM-1123-02713
Permit Status: Complete
Permit Description: construction documents for a 1489 sf expansion of a 3468 sf existing medical office in an existing building
Start Date Submittal Complete Date Status  
05/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/28/2024 APPROVED Review Details
11/22/2023 COMMERCIAL REVIEW - FULL v.1 12/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-1123-02713
Permit Status: Complete
Permit Description: construction documents for a 1489 sf expansion of a 3468 sf existing medical office in an existing building
Date Description Comments
11/30/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/22/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/30/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02713
Permite Description: construction documents for a 1489 sf expansion of a 3468 sf existing medical office in an existing building
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/15/2024 COT - HCPL - Sewer N/A Not Applicable
05/24/2024 COT - BULD - SWG Clearance N/A Not Applicable Not required. No natural gas to suite.
05/24/2024 COT - FCON - Sprinkler - Final N/A Partial Pass Sprinkler head in the back of the reception area needs to be moved it is blocked by the cabinets.
05/24/2024 COT - FCON - Fire - Final N/A Partial Pass Sprinkler head in the back of the reception area needs to be moved it is blocked by the cabinets.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02713
Permit Description: construction documents for a 1489 sf expansion of a 3468 sf existing medical office in an existing building
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/15/2024 COT - HCBU - Framing Passed
02/15/2024 COT - HCEL - Electrical Progress Passed
02/15/2024 COT - HCPL - Plumbing Progress Passed
04/02/2024 COT - HCEL - Electrical Above Ceiling Passed
04/02/2024 COT - HCPL - Plumbing Above Ceiling Passed
04/11/2024 COT - HCME - Mechanical Above Ceiling Passed
04/11/2024 COT - HCBU - Building Above Ceiling Passed
05/03/2024 COT - FCON - Alarm - Final Passed
05/03/2024 ENGR Engineering Final Passed
05/03/2024 COT - HCBU - Building Final Passed
05/03/2024 COT - HCBU - Building Progress Passed
05/03/2024 COT - HCEL - Electrical Final Passed
05/03/2024 COT - HCEL - Grounding/Bonding Passed
05/03/2024 COT - HCME - Mechanical Final Passed
05/03/2024 COT - HCME - Mechanical Progress Passed
05/03/2024 COT - HCME - Venting Passed
05/03/2024 COT - HCPL - Plumbing Final Passed
05/24/2024 BULD - Electrical Clearance Passed 5/24/24: Dryer box has been added, solder connections have been corrected. Okay to proceed with installation of insulation and drywall.
05/24/2024 TRSP - ROW - Final/Close-Out Passed
05/24/2024 COT - HCBU - CofO Passed Remodeling project is complete and tenant has moved into suite. Okay to issue Certificate of Completion or Occupancy for this permit.
06/05/2024 COT - FCON - Sprinkler - Final Passed
06/05/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
BALANCE REPORT_V1.PDF DOCUMENTS VIEW
WATER STERILIZATION REPORT-2024-05-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW