Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/14/2023
Applicant:
Joseph Maher
Description:
Minor repair & remodel of an existing condo residential unit.

Permit Reviews

Permit Number - TC-COM-1123-02667
Permit Status: Complete
Permit Description: Minor repair & remodel of an existing condo residential unit.
Start Date Submittal Complete Date Status  
11/17/2023 COMMERCIAL REVIEW - FULL v.1 02/29/2024 REQUIRES RESUBMIT Review Details
02/29/2024 COMMERCIAL REVIEW - FULL v.2 03/05/2024 APPROVED Review Details
03/05/2024 RESTAMP - COMMERCIAL v.1 03/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1123-02667
Permit Status: Complete
Permit Description: Minor repair & remodel of an existing condo residential unit.
Date Description Comments
11/17/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02667
Permite Description: Minor repair & remodel of an existing condo residential unit.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/29/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Not Applicable Not required for this project.
07/29/2024 COT - HCBU - Preslab N/A Not Applicable Not required for this project.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02667
Permit Description: Minor repair & remodel of an existing condo residential unit.
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/29/2024 COT - HCBU - Building Above Ceiling Passed Girder beam is in place, 4 by 6 post is installed and properly secured to bottom & top plate with H3 clip securing it all together. Okay to proceed with drywall & insulation installation, patch, repair, tape, texture, and paint of drywall on ceiling and walls.
07/29/2024 COT - HCBU - Framing Passed Girder beam is in place, 4 by 6 post is installed and properly secured to bottom & top plate with H3 clip securing it all together. Okay to proceed with drywall & insulation installation, patch, repair, tape, texture, and paint of drywall on ceiling and walls.
09/03/2024 COT - HCBU - Interior Shear Bracing Passed
10/07/2024 COT - HCBU - Building Final Passed
10/22/2024 TRSP - ROW - Final/Close-Out Passed
10/22/2024 ENGR Engineering Final Passed