Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
11/14/2023
Applicant:
Joseph Maher
Description:
Minor repair & remodel of an existing condo residential unit.

Permit Reviews

Permit Number - TC-COM-1123-02664
Permit Status: Inspections
Permit Description: Minor repair & remodel of an existing condo residential unit.
Start Date Submittal Complete Date Status  
11/17/2023 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details
02/29/2024 COMMERCIAL REVIEW - FULL v.2 03/05/2024 APPROVED Review Details
03/05/2024 RESTAMP - COMMERCIAL v.1 03/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1123-02664
Permit Status: Inspections
Permit Description: Minor repair & remodel of an existing condo residential unit.
Date Description Comments
11/17/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1123-02664
Permite Description: Minor repair & remodel of an existing condo residential unit.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/27/2025 COT - HCBU - Building Above Ceiling N/A Not Applicable 3-27-25, not applicable.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1123-02664
Permit Description: Minor repair & remodel of an existing condo residential unit.
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/27/2025 COT - HCBU - Excavation/Rebar/Zoning Passed 3-27-25, reinforcement per plan for footer. Okay to pour.
03/27/2025 COT - HCBU - Preslab Passed 3-27-25, approved. Okay to pour footing.
04/15/2025 COT - HCBU - Framing Passed