Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1122-00168
Permit Details
Apply Date:
11/23/2022
Applicant:
Jessica Lacy
Description:
The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Permit Reviews
Permit Number - TC-COM-1122-00168
Permit Status: In review
Permit Description: The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
06/02/2023 | RESTAMP - COMMERCIAL v.1 | 06/05/2023 | APPROVED |
02/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
05/22/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/02/2023 | APPROVED |
12/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/30/2024 | APPROVED |
12/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/10/2023 | REQUIRES RESUBMIT |
07/05/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1122-00168
Permit Status: In review
Permit Description: The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Total Outstanding Activity Conditions - 11
Date | Name |
---|---|
08/19/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
08/19/2024 | COMMISSIONING REPORT IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
08/19/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
08/19/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Conditions
Permit Number - TC-COM-1122-00168
Permit Status: In review
Permit Description: The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Date | Description | Comments |
---|---|---|
08/19/2024 | AIR BALANCING REPORT IS REQUIRED. | |
07/17/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-1122-00168
Permite Description: The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/23/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | 12-23-24, not applicable |
12/23/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | Not applicable, 12-23-24 |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-1122-00168
Permit Description: The scope of work consists of an Interior Remodel and Minor Exterior Improvements of an existing free-standing fire station building.
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2024 | COT - HCPL - Rough Soil | Passed | 8/28/24: Underground plumbing is properly installed and connected to main building and septic system. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
09/26/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
12/10/2024 | COT - HCEL - Electrical Intermediate | Passed | 12-10-24, intermediates approved. Okay to continue with construction. | |
12/10/2024 | COT - HCEL - Electrical Above Ceiling | Passed | 12-10-24, electrical above ceiling verified as per approved plans.Okay to continue with construction. | |
12/10/2024 | COT - HCME - Mechanical Above Ceiling | Passed | 12-10-24, mechanical above ceiling verified as per approved plans.Okay to continue with construction. | |
12/10/2024 | COT - HCPL - Plumbing Intermediate | Passed | 12-10-24, plumbing intermediates approved. Okay to continue with construction. | |
12/19/2024 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP INCR. 12/19/2024 | |
12/23/2024 | COT - HCEL - Electrical Progress | Passed | 12-23-24, approved | |
12/23/2024 | COT - HCBU - Building Final | Passed | 12-23-24, building final approved. | |
12/23/2024 | COT - HCEL - Electrical Final | Passed | 12-23-24, electrical final approved. | |
12/23/2024 | COT - HCPL - Plumbing Final | Passed | 12-23-24, plumbing final approved. | |
12/23/2024 | COT - HCME - Mechanical Final | Passed | 12-23-24, approved. | |
12/23/2024 | COT - HCPL - Plumbing Progress | Passed | 12-23-24, approved. | |
12/23/2024 | COT - HCBU - Building Progress | Passed | 12-23-24, approved. | |
12/23/2024 | COT - HCME - Mechanical Intermediate | Passed | 12-23-24, mechanical intermediates approved. | |
12/23/2024 | COT - HCME - Mechanical Progress | Passed | 12-23-24, approved. | |
12/23/2024 | ENGR Engineering Final | Passed | Dumpster and Port A Jon will be removed by or just after the 1st of the year, neither one pose and safety issues and the FD is still using the dumpster. CO Ready |
|
12/23/2024 | TRSP - ROW - Final/Close-Out | Passed | scope of work has no impact to right of way, permit closed | |
12/23/2024 | COT - HCBU - Framing | Passed | 12-23-24,framing verified per approved plans. | |
12/24/2024 | COT - FCON - Fire - Final | Passed | ||
01/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed |