Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
PARTIAL PASS--Underground plumbing from 5' of septic sewer line to north end of building is dug with 4" pipe installed in trench and under water test with no leaks. Okay to backfill trench within 5' of building and septic tank until final connections are completed. |
| 08/28/2024 |
COT - HCPL - Rough Soil |
|
Passed |
8/28/24: Underground plumbing is properly installed and connected to main building and septic system. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. |