Permit: TC-COM-1122-00097
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
9013 E OLD VAIL RD BLDG 9
Address NEW:
9013 E OLD VAIL RD BLDG 9
Apply Date:
11/10/2022
Applicant:
Chris Guinter
Description:
2nd Party - COMMERCIAL CONSTRUCTION, STORAGE FACILITY METAL BUILDING WAREHOUSE
Permit Reviews
Permit Number - TC-COM-1122-00097
Permit Status: Complete
Permit Description: 2nd Party - COMMERCIAL CONSTRUCTION, STORAGE FACILITY METAL BUILDING WAREHOUSE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/22/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/22/2022 | REQUIRES RESUBMIT |
| 03/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/12/2025 | REQUIRES RESUBMIT |
| 04/18/2023 | RESTAMP - COMMERCIAL v.1 | 04/19/2023 | REQUIRES RESUBMIT |
| 03/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/26/2025 | REQUIRES RESUBMIT |
| 03/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/18/2023 | APPROVED |
| 06/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/11/2023 | APPROVED |
| 04/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 04/09/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1122-00097
Permit Status: Complete
Permit Description: 2nd Party - COMMERCIAL CONSTRUCTION, STORAGE FACILITY METAL BUILDING WAREHOUSE
| Date | Description | Comments |
|---|---|---|
| 03/30/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 03/12/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00097
Permite Description: 2nd Party - COMMERCIAL CONSTRUCTION, STORAGE FACILITY METAL BUILDING WAREHOUSE
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | COT - HCPL - Rough Soil | N/A | Canceled | 11/13/23: cancel per Jose |
| 05/02/2024 | COT - HCPL - Backwater Valve | N/A | Not Applicable | |
| 02/26/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/17/2024 | COT - HCBU - Building Progress | N/A | Partial Pass | Contractor wanted yard water line inspection, was not available on his permit. Created a new inspection for yard water line and approved it. |
| 04/26/2024 | COT - HCEL - Electrical Progress | N/A | Canceled | Cancelled, contractor needed electrical underground inspection not electrical progress. |
| 03/14/2025 | COT - HCBU - CofO | N/A | Re-inspection required | 3-14-25, see pending conditions |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00097
Permit Description: 2nd Party - COMMERCIAL CONSTRUCTION, STORAGE FACILITY METAL BUILDING WAREHOUSE
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2023 | COT - HCPL - Rough Soil | Passed | Approved underground soil within building, okay to continue with pre-slab | |
| 12/15/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is properly installed, supported off the ground with dobies and matches plan design. Okay to pour concrete for footings and slab. | |
| 12/15/2023 | COT - HCEL - Grounding/Bonding | Passed | Ufer ground is properly installed on the bottom rebar reinforcement. Okay to pour concrete footings and slab on grade. | |
| 12/15/2023 | COT - HCBU - Preslab | Passed | Rebar reinforcement is properly installed, supported off the ground with dobies and matches plan design. Okay to pour concrete for footings and slab. | |
| 04/26/2024 | COT - HCEL - Electrical Underground | Passed | 4" conduit has been installed in 4 foot trench from transformer to Building #9 SES. Okay to shade conduit and backfill trench. | |
| 05/02/2024 | COT - HCPL - Plumbing Progress | Passed | ||
| 05/17/2024 | COT - HCPL - Yard Water Line | Passed | Yard water line is trenched from meter box to building with blue tracer wire wrapped around pipe and is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 06/03/2024 | BULD - Electrical Clearance | Passed | TEP ECO building 9 units 1m and 2m | |
| 09/27/2024 | COT - HCBU - Framing | Passed | ||
| 09/27/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 09/27/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 09/27/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 02/26/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 02/26/2025 | COT - HCBU - Building Progress | Passed | ||
| 02/26/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 02/26/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 02/26/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 02/26/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 02/26/2025 | COT - HCEL - Electrical Final | Passed | ||
| 02/26/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 02/26/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 02/26/2025 | COT - HCME - Mechanical Final | Passed | ||
| 02/26/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 02/26/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 02/26/2025 | ENGR Engineering Final | Passed | No issues found, DP has been cleared by Josh and Ben | |
| 02/27/2025 | COT - FCON - Fire - Final | Passed | ||
| 03/10/2025 | COT - HCBU - Building Final | Passed | 3-10-25, building final approved-pending fire. | |
| 04/11/2025 | COT - HCBU - CofO | Passed | 4-11-25, all conditions met. Building approved for C of O. |