Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1390 W SPEEDWAY BL
Apply Date:
11/07/2022
Applicant:
Cary Broschat
Description:
50 kW AC Solar Shade Structure Installation

Permit Reviews

Permit Number - TC-COM-1122-00060
Permit Status: Complete
Permit Description: 50 kW AC Solar Shade Structure Installation
Start Date Submittal Complete Date Status  
05/08/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2023 APPROVED Review Details
02/07/2023 COMMERCIAL REVIEW - FULL v.2 03/13/2023 APPROVED Review Details
11/15/2022 COMMERCIAL REVIEW - FULL v.1 12/14/2022 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1122-00060
Permit Status: Complete
Permit Description: 50 kW AC Solar Shade Structure Installation
Total Outstanding Activity Conditions - 1
Date Name
12/14/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00060
Permite Description: 50 kW AC Solar Shade Structure Installation
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/20/2023 COT - LCBU - Building Progress N/A Not Applicable
04/20/2023 COT - LCEL - Electrical Intermediate N/A Not Applicable duplicate
04/07/2023 COT - LCEL - Electrical Underground N/A Partial Pass 3/20/23 - Partial for grounding by metal column embedment per plan
3/24/23 - Partial for conduit stub up at column of the equipment location, okay for concrete

3/29/23 - Partial for conduits from Meter 2 structure to Panel 1 structure location, okay backfill progress areas

4/4/23- Backfill ok for Meter 1 to Canopy 1 and Meter 2 to Canopy 2

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00060
Permit Description: 50 kW AC Solar Shade Structure Installation
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/20/2023 COT - LCEL - Grounding/Bonding Passed Approved, grounding by metal column embedment per plan
03/21/2023 COT - LCBU - Preslab Passed
03/21/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/20/2023 COT - LCBU - Framing Passed Approved per special inspection, west canopy
04/20/2023 COT - LCEL - Outdoor Lighting Passed
04/20/2023 COT - LCEL - Electrical Underground Passed
07/09/2023 COT - LCBU - Building Final Passed
07/09/2023 COT - LCEL - Electrical Final Passed Luis 520.861.8584
07/09/2023 BULD - Electrical Clearance Passed Luis A. De La Torre

SOLON Corporation



Luis 520.861.8584

7/9/2023 verbal clearance for TEP DGC/DGL meter #2 ERP (El Rio Park) from transformer #73

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
SPEEDWAY M2 SI CERTIFICATE_SIGNED-2023-04-27_V1.PDF DOCUMENTS VIEW
TC-COM-1122-00060 - COT 1390 SPEEDWAY M2 - SI FINAL REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-COT SPEEDWAY M2_SEALED SET_COMBINED_20230120_V2.PDF DOCUMENTS VIEW
COT SPEEDWAY GEOTECH REPORT_V1.PDF DOCUMENTS VIEW
COT SPEEDWAY SIGNED SPECIAL INSPECTION CERTIFICATE-2022-11-07_V1.PDF DOCUMENTS VIEW
COT SPEEDWAY_SEALED SET_CALCULATIONS_20221026_V1.PDF DOCUMENTS VIEW