Permit: TC-COM-1122-00060

Parcel: 11522002A


Addresses:

1390 W SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Date Description Inspector Results Comments
03/20/2023 COT - LCEL - Electrical Underground  Partial Pass Partial for grounding by metal column embedment per plan
03/24/2023 COT - LCEL - Electrical Underground  Partial Pass
03/29/2023 COT - LCEL - Electrical Underground  Partial Pass Partial for conduits from Meter 2 structure to Panel 1 structure location, okay backfill progress areas
04/04/2023 COT - LCEL - Electrical Underground  Partial Pass 3/20/23 - Partial for grounding by metal column embedment per plan
3/24/23 - Partial for conduit stub up at column of the equipment location, okay for concrete

3/29/23 - Partial for conduits from Meter 2 structure to Panel 1 structure location, okay backfill progress areas

4/4/23- Backfill ok for Meter 1 to Canopy 1 and Meter 2 to Canopy 2
04/10/2023 COT - LCEL - Electrical Underground  Partial Pass
04/12/2023 COT - LCEL - Electrical Underground  Partial Pass
04/20/2023 COT - LCEL - Electrical Underground  Passed