Permit: TC-COM-1122-00050
Permit Details
Apply Date:
11/04/2022
Applicant:
James Lynch
Description:
Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Permit Reviews
Permit Number - TC-COM-1122-00050
Permit Status: Issued
Permit Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/10/2022 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 12/12/2022 | REQUIRES RESUBMIT |
| 02/07/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 02/07/2023 | APPROVED |
| 01/09/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 01/26/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1122-00050
Permite Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2023 | COT - LCEL - Electrical Intermediate | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1122-00050
Permit Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2024 | COT - LCEL - Electrical Underground | Passed | 1/10/24: (2) new 3-1/2" C. And (2) existing 3-1/2" C. Ran from ATS room to generator. 1/31/24: partial electrical underground from (11) 4" C. Stubbing out of ATS room 15'. Ok to backfill progress area. 2/12/24: Electrical conduit rough-in complete (per plan) ok to backfill. |
|
| 06/20/2024 | COT - LCEL - Electrical Intermediate | Passed | 1/10/24: (2) new 3-1/2" C. And (2) existing 3-1/2" C. Ran from ATS room to generator. 1/31/24: partial electrical underground from (11) 4" C. Stubbing out of ATS room 15'. Ok to backfill progress area. 2/12/24: Electrical conduit rough-in complete (per plan) |
|
| 06/20/2024 | BULD - Electrical Clearance | Passed | 6/20/24: TEP ECO Clearance for 3321 E GLOBAL LP | |
| 06/20/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 06/20/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
| 06/20/2024 | COT - LCEL - Grounding/Bonding | Passed |