3321 E GLOBAL LP
Address NEW:
3321 E GLOBAL LP
Apply Date:
11/04/2022
Applicant:
James Lynch
Description:
Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets

Permit Reviews

Permit Number - TC-COM-1122-00050
Permit Status: Issued
Permit Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Start Date Submittal Complete Date Status  
11/10/2022 COMMERCIAL PDSD SIMPLE REVIEW v.1 12/12/2022 REQUIRES RESUBMIT Review Details
02/07/2023 COMMERCIAL PDSD SIMPLE REVIEW v.3 02/07/2023 APPROVED Review Details
01/09/2023 COMMERCIAL PDSD SIMPLE REVIEW v.2 01/26/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-1122-00050
Permite Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/11/2023 COT - LCEL - Electrical Intermediate N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-1122-00050
Permit Description: Install 600kw NG generator with new ATS and switchgear. Underground electric conduit and electrical infrastructure for new UPS in IT closets
Total Completed Inspections - 6
Date Description Inspector Results Comments
02/12/2024 COT - LCEL - Electrical Underground Passed 1/10/24: (2) new 3-1/2" C. And (2) existing 3-1/2" C. Ran from ATS room to generator.
1/31/24: partial electrical underground from (11) 4" C. Stubbing out of ATS room 15'. Ok to backfill progress area.
2/12/24: Electrical conduit rough-in complete (per plan) ok to backfill.
06/20/2024 COT - LCEL - Electrical Intermediate Passed 1/10/24: (2) new 3-1/2" C. And (2) existing 3-1/2" C. Ran from ATS room to generator.
1/31/24: partial electrical underground from (11) 4" C. Stubbing out of ATS room 15'. Ok to backfill progress area.
2/12/24: Electrical conduit rough-in complete (per plan)
06/20/2024 BULD - Electrical Clearance Passed 6/20/24: TEP ECO Clearance for 3321 E GLOBAL LP
06/20/2024 COT - LCEL - Electrical Above Ceiling Passed
06/20/2024 COT - LCEL - Outdoor Lighting Passed
06/20/2024 COT - LCEL - Grounding/Bonding Passed