Permit: TC-COM-1025-01915
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
3439 E FLOWER ST UNIT 2
Address NEW:
3439 E FLOWER ST UNIT 2
Apply Date:
10/16/2025
Applicant:
BLANCA CEPIN JOEL N CEPIN
Description:
Re pipe triplex due to underground gas leak. Each unit has only one gas water heater and one gas stove. Southwest Gas to relocate meter.
Permit Reviews
Permit Number - TC-COM-1025-01915
Permit Status: Inspections
Permit Description: Re pipe triplex due to underground gas leak. Each unit has only one gas water heater and one gas stove. Southwest Gas to relocate meter.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 10/20/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1025-01915
Permit Status: Inspections
Permit Description: Re pipe triplex due to underground gas leak. Each unit has only one gas water heater and one gas stove. Southwest Gas to relocate meter.
| Date | Description | Comments |
|---|---|---|
| 10/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1025-01915
Permite Description: Re pipe triplex due to underground gas leak. Each unit has only one gas water heater and one gas stove. Southwest Gas to relocate meter.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 11/04/2025 | COT - LCPL - Gas Pressure Test | N/A | Canceled | |
| 11/04/2025 | COT - LCPL - Plumbing Final | N/A | Canceled | Canceled per contractor |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1025-01915
Permit Description: Re pipe triplex due to underground gas leak. Each unit has only one gas water heater and one gas stove. Southwest Gas to relocate meter.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2025 | COT - BULD - SWG Clearance | Passed | 11.6.25 Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED for SWG CLEARANCE CODE. |
|
| 11/06/2025 | COT - LCPL - Gas Pressure Test | Passed | 11.6.25 Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED. |
|
| 11/06/2025 | COT - LCPL - Plumbing Final | Passed | 11.6.25 Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED. |