Inspection Status: Not Ready

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
10/28/2025 COT - LCPL - Plumbing Final  Not Ready please complete underground, plumbing, and pressure check on that pipe and depending on what type of pipe is used from the meter to the main tracer wire may be required
11/04/2025 COT - LCPL - Plumbing Final  Canceled
11/04/2025 COT - LCPL - Plumbing Final  Canceled Canceled per contractor
11/06/2025 COT - LCPL - Plumbing Final  Passed 11.6.25
Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED.
11/06/2025 COT - LCPL - Plumbing Final  Passed 11.6.25
Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED.