Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2025 | COT - LCPL - Plumbing Final | Not Ready | please complete underground, plumbing, and pressure check on that pipe and depending on what type of pipe is used from the meter to the main tracer wire may be required | |
| 11/04/2025 | COT - LCPL - Plumbing Final | Canceled | ||
| 11/04/2025 | COT - LCPL - Plumbing Final | Canceled | Canceled per contractor | |
| 11/06/2025 | COT - LCPL - Plumbing Final | Passed | 11.6.25 Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED. |
|
| 11/06/2025 | COT - LCPL - Plumbing Final | Passed | 11.6.25 Line pressure verified, shut offs verified, material verified, supports verified. System has been installed according to diagrams. APPROVED. |