Permit: TC-COM-1024-02000
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1755 S HOUGHTON RD BLDG 2
Address NEW:
1755 S HOUGHTON RD BLDG 2
Apply Date:
10/18/2024
Applicant:
Kelly Rehm
Description:
The Pantano Christian Church PV2 system (46.28kW DC) consists of 89 520W PV modules. 23 grid-tied microinverters will supply power through an existing TEP service. All modules are to be roof-mounted.
Permit Reviews
Permit Number - TC-COM-1024-02000
Permit Status: Complete
Permit Description: The Pantano Christian Church PV2 system (46.28kW DC) consists of 89 520W PV modules. 23 grid-tied microinverters will supply power through an existing TEP service. All modules are to be roof-mounted.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/14/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02000
Permite Description: The Pantano Christian Church PV2 system (46.28kW DC) consists of 89 520W PV modules. 23 grid-tied microinverters will supply power through an existing TEP service. All modules are to be roof-mounted.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02000
Permit Description: The Pantano Christian Church PV2 system (46.28kW DC) consists of 89 520W PV modules. 23 grid-tied microinverters will supply power through an existing TEP service. All modules are to be roof-mounted.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 02/12/2025 | COT - LCBU - Building Final | Passed | ||
| 02/12/2025 | ENGR Engineering Final | Passed | ||
| 02/12/2025 | TRSP - ROW - Final/Close-Out | Passed | All work was done on private property to install solar panels on the church rooftop. | |
| 02/12/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 02/12/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 02/12/2025 | BULD - Electrical Clearance | Passed | Approved 3-phase solar installation - DGC Clearance to TEP is required for the solar meter (#147550922) |