Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | BULD - Electrical Clearance | Passed | Approved 3-phase solar installation - DGC Clearance to TEP is required for the solar meter (#147550922) |