Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
6935 S TUCSON BL
Address NEW:
6935 S TUCSON BL
Apply Date:
10/16/2024
Applicant:
Adrian Zubiran
Description:
ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.

Permit Reviews

Permit Number - TC-COM-1024-01986
Permit Status: Inspections complete
Permit Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Start Date Submittal Complete Date Status  
03/10/2025 COMMERCIAL REVIEW - FULL REVISION v.1 04/14/2025 APPROVED Review Details
10/16/2024 COMMERCIAL REVIEW - FULL v.1 11/07/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01986
Permite Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/20/2024 BULD - Electrical Clearance N/A Partial Pass Partial for the supply-side tap - DGL Clearance was called into TEP at 10:55am
Pending solar

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01986
Permit Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/28/2025 COT - CSOL - Electrical Underground Solar Project Passed
05/28/2025 COT - LCBU - Building Final Passed
05/28/2025 ENGR Engineering Final Passed
05/28/2025 TRSP - ROW - Final/Close-Out Passed
05/28/2025 COT - CSOL - Electrical Intermediate Solar Project Passed
05/28/2025 COT - CSOL - Grounding/Bonding Solar Project Passed
05/28/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
05/28/2025 COT - LCBU - Framing Passed
05/28/2025 COT - CSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_REV_1_V1.PDF DOCUMENTS VIEW
REVISION NARATIVE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_1_V1.PDF DOCUMENTS VIEW
STRUCT CALCS_1_V1.PDF DOCUMENTS VIEW