Permit: TC-COM-1024-01986
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
6935 S TUCSON BL
Address NEW:
6935 S TUCSON BL
Apply Date:
10/16/2024
Applicant:
Adrian Zubiran
Description:
ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Permit Reviews
Permit Number - TC-COM-1024-01986
Permit Status: Inspections complete
Permit Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC
REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/14/2025 | APPROVED |
| 10/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/07/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01986
Permite Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC
REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the supply-side tap - DGL Clearance was called into TEP at 10:55am Pending solar |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01986
Permit Description: ROOFTOP COMMERCIAL PV SOLAR PROJECT - 139.2KWDC
REV1: Revised rooftop attachment method to Ironridge Standoff. Revised solar PV module to (254) TALESUN BIPRO TD7G72M-545W. DC system sized decreased to 138.43 kWp DC.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 05/28/2025 | COT - LCBU - Building Final | Passed | ||
| 05/28/2025 | ENGR Engineering Final | Passed | ||
| 05/28/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/28/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 05/28/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 05/28/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 05/28/2025 | COT - LCBU - Framing | Passed | ||
| 05/28/2025 | COT - CSOL - Electrical Final Solar Project | Passed |