Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 12/20/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the supply-side tap - DGL Clearance was called into TEP at 10:55am Pending solar |