Permit: TC-COM-1023-02507
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
425 S MANN AV
Address NEW:
425 S MANN AV
Apply Date:
10/23/2023
Applicant:
Amy Peron
Description:
Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Permit Reviews
Permit Number - TC-COM-1023-02507
Permit Status: Inspections complete
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/14/2024 | APPROVED |
| 02/14/2024 | RESTAMP - COMMERCIAL v.1 | 02/26/2024 | APPROVED |
| 03/17/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/24/2026 | APPROVED |
| 02/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/20/2026 | APPROVED |
| 03/17/2026 | SPECIAL INSPECTION REVIEW v.2 | 08/23/2026 | VOID |
| 10/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/04/2024 | REQUIRES RESUBMIT |
| 09/04/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/11/2026 | APPROVED |
| 08/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/26/2026 | REQUIRES RESUBMIT |
| 02/10/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/24/2026 | IN REVIEW |
| 08/28/2026 | SPECIAL INSPECTION REVIEW v.2 | 08/31/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1023-02507
Permit Status: Inspections complete
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/05/2024 | Electrical Conduits Designs must be submitted and approved prior to final. |
| 02/05/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-1023-02507
Permit Status: Inspections complete
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
| Date | Description | Comments |
|---|---|---|
| 02/05/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/05/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 02/05/2024 | PRE-ENGINEERED METAL SHADE CANOPY Designs must be submitted and approved prior to final. | |
| 02/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1023-02507
Permite Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2025 | COT - HCEL - Outdoor Lighting | N/A | Not Applicable | |
| 10/16/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/31/2024 | COT - HCEL - Electrical Underground | N/A | Canceled | |
| 05/29/2026 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Not Applicable | |
| 10/27/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 11/05/2025 | ENGR Engineering Final | N/A | Partial Pass | Revision required to reflect as-built status. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1023-02507
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2024 | COT - HCBU - Preslab | Passed | Concrete forms are set and post tension cabling is evenly installed. Okay to pour concrete. | |
| 09/16/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 10/16/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 11/05/2025 | COT - HCBU - Building Final | Passed | ||
| 11/05/2025 | TRSP - ROW - Notice of Completion | Passed | ||
| 11/05/2025 | COT - HCBU - CofO | Passed | ||
| 04/01/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/01/2026 | COT - HCBU - Building Progress | Passed | UG electric in footings. | |
| 04/07/2026 | COT - HCEL - Electrical Underground | Passed | ||
| 05/26/2026 | COT - HCBU - Roof Nailing | Passed | ||
| 05/29/2026 | COT - HCEL - Electrical Final | Passed | Passed | |
| 11/13/2026 | ENGR Engineering Final | Passed |