Permit: TC-COM-1023-02507
Permit Details
Apply Date:
10/23/2023
Applicant:
Amy Peron
Description:
Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Permit Reviews
Permit Number - TC-COM-1023-02507
Permit Status: In review
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/14/2024 | APPROVED |
| 02/14/2024 | RESTAMP - COMMERCIAL v.1 | 02/26/2024 | APPROVED |
| 03/17/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
| 02/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/20/2026 | APPROVED |
| 03/17/2026 | SPECIAL INSPECTION REVIEW v.2 | N/A | IN REVIEW |
| 10/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/04/2024 | REQUIRES RESUBMIT |
| 02/10/2026 | SPECIAL INSPECTION REVIEW v.1 | 02/11/2026 | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-1023-02507
Permit Status: In review
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/05/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 02/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/05/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 02/05/2024 | Electrical Conduits Designs must be submitted and approved prior to final. |
| 02/05/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 02/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-COM-1023-02507
Permit Status: In review
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
| Date | Description | Comments |
|---|---|---|
| 10/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/05/2024 | PRE-ENGINEERED METAL SHADE CANOPY Designs must be submitted and approved prior to final. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-1023-02507
Permite Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | COT - HCEL - Electrical Underground | N/A | Canceled | |
| 10/16/2025 | COT - HCEL - Outdoor Lighting | N/A | Not Applicable | |
| 10/16/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/05/2025 | ENGR Engineering Final | N/A | Partial Pass | Revision required to reflect as-built status. |
| 02/18/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Canceled | Per workman on site. |
| 10/16/2025 | COT - HCEL - Electrical Final | N/A | Not Applicable | |
| 04/01/2026 | COT - HCBU - Building Progress | N/A | Partial Pass | UG electric in footings. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-1023-02507
Permit Description: Replacement of the existing tennis courts and basketball court with (2) new covered
basketball courts and (6) new pickleball courts.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2024 | COT - HCBU - Preslab | Passed | Concrete forms are set and post tension cabling is evenly installed. Okay to pour concrete. | |
| 01/02/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 09/16/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 09/18/2025 | BULD - Electrical Clearance | Passed | Service for lighting. | |
| 10/16/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 11/05/2025 | COT - HCBU - Building Final | Passed | ||
| 11/05/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/05/2025 | COT - HCBU - CofO | Passed | ||
| 04/01/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed |