Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1023-02487
Permit Details
Apply Date:
10/20/2023
Applicant:
Alicia Simmons
Description:
Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Permit Reviews
Permit Number - TC-COM-1023-02487
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/29/2024 | REQUIRES RESUBMIT |
10/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/08/2024 | REQUIRES RESUBMIT |
02/21/2024 | RESTAMP - COMMERCIAL v.1 | 02/28/2024 | APPROVED |
02/13/2024 | COMMERCIAL REVIEW - FULL v.3 | 02/15/2024 | REQUIRES RESUBMIT |
02/16/2024 | COMMERCIAL REVIEW - FULL v.4 | 02/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1023-02487
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Outstanding Activity Conditions - 8
Date | Name |
---|---|
01/05/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
01/05/2024 | Post-Installed Anchor Inspection Report is required. |
01/05/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
01/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
01/05/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1023-02487
Permit Status: Issued
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Date | Description | Comments |
---|---|---|
10/25/2023 | Please provide plans which contain the Building Number 3 associated with this permit. | |
10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1023-02487
Permite Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Building #3. Partial pass. PERIMETER FOOTINGS. GRID LINE 1 ABOUT 5 ยด FROM GRID LINE A-D. ALL OF GRID LINE D. GRID LINE 6 AND 7. Okay for concrete placement. 6/20/2024 |
06/28/2024 | COT - HCPL - Sewer | N/A | Partial Pass | |
09/25/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Partial approval for admin building under slab for electrical conduit and risers stubbed out to outside the footing area |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1023-02487
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/19/2024 | COT - HCPL - Rough Soil | Passed |