Permit: TC-COM-1023-02482
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1131 N 6TH AV BLDG 1
Address NEW:
1131 N 6TH AV BLDG 1
Apply Date:
10/19/2023
Applicant:
Description:
THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1). THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR, PARKING, SITE WALLS AND SIDEWALK . THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Permit Reviews
Permit Number - TC-COM-1023-02482
Permit Status: Complete
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/10/2024 | APPROVED |
| 02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
| 08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
| 01/17/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/19/2024 | APPROVED |
| 04/09/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/09/2024 | REQUIRES RESUBMIT |
| 10/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/22/2023 | REQUIRES RESUBMIT |
| 08/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2024 | REQUIRES RESUBMIT |
| 02/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2024 | APPROVED |
| 08/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/26/2024 | APPROVED |
| 12/18/2023 | COMMERCIAL REVIEW - FULL v.2 | 01/12/2024 | REQUIRES RESUBMIT |
| 01/19/2024 | RESTAMP - COMMERCIAL v.1 | 01/23/2024 | APPROVED |
| 09/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/06/2024 | APPROVED |
| 09/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1023-02482
Permit Status: Complete
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
| Date | Description | Comments |
|---|---|---|
| 10/26/2023 | ADDRESS FOR BLDG 1 & 2 (SHARED REVIEW) WILL NEED TO BE REFLECTED/DEFINED ON THE FINAL SET OF PLANS PRIOR TO P ISSUANCE. Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 01/22/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 09/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/14/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-1023-00417 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 09/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/03/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 09/03/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 01/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 08/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 01/22/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02482
Permite Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2024 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | |
| 07/23/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Client will no longer require gas service. Gas lines to be abandoned. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02482
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 03/14/2024 | COT - HCBU - Framing | Passed | Framed wall in laundry area, Ok to insulate and cover wall. | |
| 07/18/2024 | BULD - Electrical Clearance | Passed | Building #1 is a sub panel,from building #2. | |
| 07/18/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 08/01/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 08/01/2024 | COT - HCBU - Preslab | Passed | ||
| 08/01/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 08/09/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 08/09/2024 | COT - HCME - Mechanical Final | Passed | ||
| 08/09/2024 | COT - HCEL - Electrical Final | Passed | ||
| 08/12/2024 | COT - FCON - Alarm - Final | Passed | ||
| 08/20/2024 | COT - FCON - Fire - Final | Passed | Approved per Insp. CBass | |
| 08/20/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 08/20/2024 | ENGR Engineering Final | Passed | ||
| 08/20/2024 | COT - HCBU - Building Final | Passed |