Permit: TC-COM-0926-01563
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
9915 E OLD VAIL RD
Address NEW:
9915 E OLD VAIL RD
Apply Date:
09/16/2026
Applicant:
Crista Mapes
Description:
New Credit Union with drive-thru
Permit Reviews
Permit Number - TC-COM-0926-01563
Permit Status: Needs resubmittal
Permit Description: New Credit Union with drive-thru
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/22/2026 | COMMERCIAL REVIEW - FULL v.1 | 10/13/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0926-01563
Permit Status: Needs resubmittal
Permit Description: New Credit Union with drive-thru
Total Outstanding Activity Conditions - 14
| Date | Name |
|---|---|
| 09/22/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 09/22/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. |
| 10/09/2026 | Prior to Final - Special Inspections -SPECIAL INSPECTION OF SOILS IS REQUIRED. |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF EXTERIOR INSULATION AND FINISH SYSTEM IS REQUIRED. |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. BOLTING |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. |
| 10/09/2026 | Pre-Engineered Wood Truss Design plans must be submitted and approved prior to installation |
| 10/09/2026 | Prior to Final - Deferred Submittals - Pre-Fabricated Vault Designs must be submitted and approved prior to ... |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF WATER -RESISTIVE BARRIER COATING IS REQUIRED. |
| 10/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. WELDING |
| 10/12/2026 | Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED. |
| 10/12/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 10/12/2026 | WATER STERILIZATION REPORT IS REQUIRED. |