Permit Number - TC-COM-0926-01563
Permit Status: Needs resubmittal
Permit Description: New Credit Union with drive-thru
Start Date Submittal Complete Date Status  
09/22/2026 COMMERCIAL REVIEW - FULL v.1 10/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0926-01563
Permit Status: Needs resubmittal
Permit Description: New Credit Union with drive-thru
Total Outstanding Activity Conditions - 14
Date Name
09/22/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/22/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
10/09/2026 Prior to Final - Special Inspections -SPECIAL INSPECTION OF SOILS IS REQUIRED.
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF EXTERIOR INSULATION AND FINISH SYSTEM IS REQUIRED.
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. BOLTING
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
10/09/2026 Pre-Engineered Wood Truss Design plans must be submitted and approved prior to installation
10/09/2026 Prior to Final - Deferred Submittals - Pre-Fabricated Vault Designs must be submitted and approved prior to ...
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF WATER -RESISTIVE BARRIER COATING IS REQUIRED.
10/09/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. WELDING
10/12/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
10/12/2026 Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
10/12/2026 WATER STERILIZATION REPORT IS REQUIRED.