Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
09/22/2025
Applicant:
Lisa Bowers
Description:
TI to existing suite

Permit Reviews

Permit Number - TC-COM-0925-01714
Permit Status: Complete
Permit Description: TI to existing suite
Start Date Submittal Complete Date Status  
10/20/2025 COMMERCIAL REVIEW - LIMITED v.2 11/04/2025 REQUIRES RESUBMIT Review Details
11/07/2025 COMMERCIAL REVIEW - LIMITED v.3 11/13/2025 APPROVED Review Details
01/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/27/2026 APPROVED Review Details
11/21/2025 ADMINISTRATIVE v.2 11/21/2025 APPROVED Review Details
09/22/2025 COMMERCIAL REVIEW - LIMITED v.1 10/13/2025 REQUIRES RESUBMIT Review Details
11/13/2025 RESTAMP - COMMERCIAL v.1 11/18/2025 APPROVED Review Details
11/18/2025 ADMINISTRATIVE v.1 11/18/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0925-01714
Permit Status: Complete
Permit Description: TI to existing suite
Date Description Comments
10/01/2025 AIR BALANCING REPORT IS REQUIRED.
11/13/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/22/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/01/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0925-01714
Permite Description: TI to existing suite
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/20/2026 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0925-01714
Permit Description: TI to existing suite
Total Completed Inspections - 15
Date Description Inspector Results Comments
11/24/2025 COT - HCPL - Rough Soil Passed
11/24/2025 COT - HCEL - Electrical Underground Passed
11/24/2025 COT - LCPL - Rough Soil Passed
11/24/2025 COT - LCEL - Electrical Above Ceiling Passed
12/15/2025 COT - HCBU - Framing Passed 12-15-25: steel framing at utility room approved.
12/18/2025 COT - LCME - Mechanical Intermediate Passed 12/18/25 passed
12/18/2025 COT - HCEL - Electrical Intermediate Passed 12/18/25 passed
12/18/2025 COT - HCPL - Plumbing Intermediate Passed 12/18/25 passed
12/18/2025 COT - LCBU - Framing Passed 12/18/25 passed
01/20/2026 COT - FCON - Sprinkler - Final Passed
01/20/2026 COT - FCON - Fire - Final Passed
01/20/2026 COT - LCEL - Electrical Final Passed
01/20/2026 COT - LCPL - Plumbing Final Passed
01/20/2026 COT - LCME - Mechanical Final Passed
01/20/2026 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
AIR BALANCE REPORT_V1.PDF DOCUMENTS VIEW
WATER STERILIZATION REPORT-2026-01-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-B - B CDS - 10 16 25_V2.PDF DOCUMENTS VIEW