Permit: TC-COM-0925-01624
Permit Details
Apply Date:
09/03/2025
Applicant:
Fabian Poblete
Description:
Panel swap from meter and subpanel to all in one bottom fed
Permit Reviews
Permit Number - TC-COM-0925-01624
Permit Status: Complete
Permit Description: Panel swap from meter and subpanel to all in one bottom fed
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 09/12/2025 | APPROVED |
| 11/03/2025 | ADMINISTRATIVE v.2 | 11/03/2025 | APPROVED |
| 09/09/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 09/09/2025 | REQUIRES RESUBMIT |
| 09/04/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 09/04/2025 | REQUIRES RESUBMIT |
| 09/12/2025 | ADMINISTRATIVE v.1 | 09/12/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0925-01624
Permit Status: Complete
Permit Description: Panel swap from meter and subpanel to all in one bottom fed
| Date | Description | Comments |
|---|---|---|
| 09/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0925-01624
Permit Description: Panel swap from meter and subpanel to all in one bottom fed
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2025 | BULD - Electrical Clearance | Passed | Passed CLEARANCE INCR FINAL PENDING REVISION TO 125 AMP MAIN CALLED TEP 11:25 to restore power | |
| 11/24/2025 | COT - LCEL - Grounding/Bonding | Passed | Passed CLEARANCE INCR FINAL PENDING REVISION TO 125 AMP MAIN | |
| 04/17/2026 | COT - LCEL - Electrical Final | Passed |