Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
9055 E CATALINA HY
Apply Date:
09/02/2025
Applicant:
TANJA WEESE
Description:
Install (2) new ev chargers

Permit Reviews

Permit Number - TC-COM-0925-01609
Permit Status: Inspections complete
Permit Description: Install (2) new ev chargers
Start Date Submittal Complete Date Status  
09/04/2025 COMMERCIAL REVIEW - FULL v.1 10/01/2025 REQUIRES RESUBMIT Review Details
01/30/2026 COMMERCIAL REVIEW - LIMITED v.1 02/11/2026 APPROVED Review Details
12/31/2025 COMMERCIAL REVIEW - FULL v.2 01/30/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0925-01609
Permit Status: Inspections complete
Permit Description: Install (2) new ev chargers
Date Description Comments
09/04/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/30/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/04/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0925-01609
Permite Description: Install (2) new ev chargers
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/26/2026 COT - LCBU - Framing N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0925-01609
Permit Description: Install (2) new ev chargers
Total Completed Inspections - 5
Date Description Inspector Results Comments
02/26/2026 COT - LCBU - Excavation/Rebar/Zoning Passed
03/05/2026 COT - LCBU - Building Final Passed
03/05/2026 COT - LCEL - Electrical Final Passed 3.5.21
Approved
03/05/2026 ENGR Engineering Final Passed Project is complete in accordance with approved plans.
03/05/2026 TRSP - ROW - Notice of Completion Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-EV25229 BEAR CANYON EV PLANS_12-16-2025_SEALED_DELTA 2_V2_V3.PDF DOCUMENTS VIEW
12-30-25 REPLY LETTER_V1.PDF DOCUMENTS VIEW