Permit: TC-COM-0924-01789
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5650 S 12TH AV UNIT 108
Address NEW:
5650 S 12TH AV UNIT 108
Apply Date:
08/14/2024
Applicant:
EMMA HAZEN
Description:
FIRE DAMAGE REPAIRS (Suite #108)
Permit Reviews
Permit Number - TC-COM-0924-01789
Permit Status: Complete
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/22/2025 | APPROVED |
| 09/18/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/15/2024 | APPROVED |
| 10/15/2024 | RESTAMP - COMMERCIAL v.1 | 10/15/2024 | APPROVED |
| 09/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/18/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0924-01789
Permit Status: Complete
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
| Date | Description | Comments |
|---|---|---|
| 09/16/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 09/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/16/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0924-01789
Permite Description: FIRE DAMAGE REPAIRS (Suite #108)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | 2/19/25: revision required on electrical, framing. Receptacle missing at restroom, existing sub-panel was replaced. |
| 05/12/2025 | COT - LCBU - Framing | N/A | Re-inspection required | 5-12-25, knee guards required for bathroom lavatory, provide ladder and remove several ceiling tiles to verify seismic wiring together with above ceiling mechanical, access to rooftop is required and all framing was covered without approval.Therefore, submit a letter to the city for review/approval with regards to all covered framing. Document that all covered construction was made by approved plans and meets the 2018 International Building Code. |
| 05/12/2025 | COT - LCBU - Roof Nailing | N/A | Re-inspection required | 5-12-25, knee guards required for bathroom lavatory, provide ladder and remove several ceiling tiles to verify seismic wiring together with above ceiling mechanical, access to rooftop is required and all framing was covered without approval.Therefore, submit a letter to the city for review/approval with regards to all covered framing. Document that all covered construction was made by approved plans and meets the 2018 International Building Code. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0924-01789
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 02/28/2025 | BULD - Electrical Clearance | Passed | 2/28/25:TEP RECN FOR 5650 S 12TH AV UNIT 108 | |
| 03/28/2025 | COT - LCEL - Electrical Final | Passed | ||
| 05/12/2025 | COT - FCON - Fire - Final | Passed | ||
| 05/16/2025 | COT - LCBU - Framing | Passed | ||
| 05/16/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 05/28/2025 | COT - LCBU - Building Above Ceiling | Passed | ||
| 05/28/2025 | COT - LCME - Mechanical Final | Passed | ||
| 05/28/2025 | COT - LCBU - Building Final | Passed |