Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/14/2024
Applicant:
EMMA HAZEN
Description:
FIRE DAMAGE REPAIRS (Suite #108)

Permit Reviews

Permit Number - TC-COM-0924-01789
Permit Status: Complete
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
Start Date Submittal Complete Date Status  
04/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/22/2025 APPROVED Review Details
09/18/2024 COMMERCIAL REVIEW - FULL v.2 10/15/2024 APPROVED Review Details
10/15/2024 RESTAMP - COMMERCIAL v.1 10/15/2024 APPROVED Review Details
09/16/2024 COMMERCIAL REVIEW - FULL v.1 09/18/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0924-01789
Permit Status: Complete
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
Date Description Comments
09/16/2024 AIR BALANCING REPORT IS REQUIRED.
09/16/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/16/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01789
Permite Description: FIRE DAMAGE REPAIRS (Suite #108)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/19/2025 COT - LCEL - Electrical Intermediate N/A Re-inspection required 2/19/25: revision required on electrical, framing. Receptacle missing at restroom, existing sub-panel was replaced.
05/12/2025 COT - LCBU - Framing N/A Re-inspection required 5-12-25, knee guards required for bathroom lavatory, provide ladder and remove several ceiling tiles to verify seismic wiring together with above ceiling mechanical, access to rooftop is required and all framing was covered without approval.Therefore, submit a letter to the city for review/approval with regards to all covered framing. Document that all covered construction was made by approved plans and meets the 2018 International Building Code.
05/12/2025 COT - LCBU - Roof Nailing N/A Re-inspection required 5-12-25, knee guards required for bathroom lavatory, provide ladder and remove several ceiling tiles to verify seismic wiring together with above ceiling mechanical, access to rooftop is required and all framing was covered without approval.Therefore, submit a letter to the city for review/approval with regards to all covered framing. Document that all covered construction was made by approved plans and meets the 2018 International Building Code.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01789
Permit Description: FIRE DAMAGE REPAIRS (Suite #108)
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/28/2025 COT - LCEL - Electrical Intermediate Passed
02/28/2025 BULD - Electrical Clearance Passed 2/28/25:TEP RECN FOR 5650 S 12TH AV UNIT 108
03/28/2025 COT - LCEL - Electrical Final Passed
05/12/2025 COT - FCON - Fire - Final Passed
05/16/2025 COT - LCBU - Framing Passed
05/16/2025 COT - LCBU - Roof Nailing Passed
05/28/2025 COT - LCBU - Building Above Ceiling Passed
05/28/2025 COT - LCME - Mechanical Final Passed
05/28/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
AIR TESTING 5650S12THAVESUITE-108_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET V2_V1.PDF DOCUMENTS VIEW
IECC - HVAC LOAD CALC_V1.PDF DOCUMENTS VIEW