Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
09/27/2023
Applicant:
David Garcia
Description:
ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE.

Permit Reviews

Permit Number - TC-COM-0923-02293
Permit Status: Complete
Permit Description: ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE.
Start Date Submittal Complete Date Status  
09/28/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 09/28/2023 REQUIRES RESUBMIT Review Details
12/15/2023 COMMERCIAL PDSD SIMPLE REVIEW v.2 12/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0923-02293
Permit Status: Complete
Permit Description: ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE.
Date Description Comments
09/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02293
Permite Description: ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/01/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready added missing underground electric inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02293
Permit Description: ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE.
Total Completed Inspections - 5
Date Description Inspector Results Comments
02/20/2024 COT - LCEL - Electrical Underground Passed Ok to cover progress areas.
02/28/2024 COT - LCBU - Building Final Passed Wiring is complete from panel to control box for gate arm. Project is complete awaiting installation of gate control and arm by others.
02/28/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
02/28/2024 COT - LCEL - Electrical Final Passed Wiring is complete from panel to control box for gate arm. Project is complete awaiting installation of gate control and arm by others.
02/28/2024 COT - LCEL - Grounding/Bonding Passed Wiring is complete from panel to control box for gate arm. Project is complete awaiting installation of gate control and arm by others.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-BANNER UMC_V1.PDF DOCUMENTS VIEW