Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
6100 S TUCSON BL
Apply Date:
09/25/2023
Applicant:
Michael Epstein
Description:
New exterior concrete pad and drainage for future equipment.

Permit Reviews

Permit Number - TC-COM-0923-02265
Permit Status: Complete
Permit Description: New exterior concrete pad and drainage for future equipment.
Start Date Submittal Complete Date Status  
03/26/2024 RESTAMP - COMMERCIAL v.1 04/01/2024 APPROVED Review Details
01/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/03/2024 REQUIRES RESUBMIT Review Details
09/26/2023 COMMERCIAL REVIEW - FULL v.1 10/18/2023 APPROVED Review Details
02/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/09/2024 APPROVED Review Details
02/15/2024 COMMERCIAL REVIEW - FULL v.1 03/06/2024 REQUIRES RESUBMIT Review Details
03/08/2024 COMMERCIAL REVIEW - FULL v.2 03/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0923-02265
Permit Status: Complete
Permit Description: New exterior concrete pad and drainage for future equipment.
Date Description Comments
02/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/09/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02265
Permite Description: New exterior concrete pad and drainage for future equipment.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/22/2023 COT - FCON - Fire - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02265
Permit Description: New exterior concrete pad and drainage for future equipment.
Total Completed Inspections - 6
Date Description Inspector Results Comments
12/22/2023 COT - HCBU - Building Final Passed
12/22/2023 ENGR Engineering Final Passed
12/22/2023 TRSP - ROW - Final/Close-Out Passed
12/22/2023 COT - HCBU - Building Progress Passed
12/22/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
12/22/2023 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
CONS-07_2024-03-01_CONSTRUCTIONSET_DELTA3_V2.PDF DOCUMENTS VIEW
TC-COM-0923-02265.SIGNED-REV-2024-02-09_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-WILLDAN_APPROVED UPDATED G000 CONS-MATERION - COOLANT FILTER SLAB - TRENCH - SEALED SET_V1.PDF DOCUMENTS VIEW
WILLDAN_APPROVED_STRUCTURAL CALCULATIONS_V1_V1.PDF DOCUMENTS VIEW
WSM ARCH MATERION PSA_V1.PDF DOCUMENTS VIEW