Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
09/22/2023
Applicant:
Description:
PHASE 2 COVERED PARKING STRUCTURES. REFERENCE TC-MDP-0123-002 29AND DP21-0184 (no utilities such as electric)

Permit Reviews

Permit Number - TC-COM-0923-02263
Permit Status: Issued
Permit Description: PHASE 2 COVERED PARKING STRUCTURES. REFERENCE TC-MDP-0123-002 29AND DP21-0184 (no utilities such as electric)
Start Date Submittal Complete Date Status  
09/26/2023 COMMERCIAL REVIEW - FULL v.1 11/02/2023 APPROVED Review Details
09/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0923-02263
Permit Status: Issued
Permit Description: PHASE 2 COVERED PARKING STRUCTURES. REFERENCE TC-MDP-0123-002 29AND DP21-0184 (no utilities such as electric)
Date Description Comments
11/02/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/28/2023 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
11/02/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/02/2023 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0923-02263
Permite Description: PHASE 2 COVERED PARKING STRUCTURES. REFERENCE TC-MDP-0123-002 29AND DP21-0184 (no utilities such as electric)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/15/2023 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass Total of 8 footing columns for canopy carport. East of the building. Okay for concrete placement in footings. 12/15/2023

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0923-02263
Permit Description: PHASE 2 COVERED PARKING STRUCTURES. REFERENCE TC-MDP-0123-002 29AND DP21-0184 (no utilities such as electric)
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/04/2023 COT - FCON - Fire - Final Passed
05/28/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
07/16/2025 COT - LCBU - Building Final Passed
07/16/2025 ENGR Engineering Final Passed
07/16/2025 COT - LCBU - Framing Passed
07/16/2025 COT - HCEL - Electrical Underground Passed