Inspection Status: Partial Pass
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 01/29/2024 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Electrical underground for lighting at canopy’s total of 5 canopy’s. 3/4”conduit at 24” depth (Shade structures). 1/29/2024 |
| 05/28/2025 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Passed |
|
| 07/31/2024 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
7/21/24 inspection called for parking shade cover footings building 2832 Eastside six structures building 2028 three structures on northside OK to place concrete |
| 08/06/2024 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
8/6/24 inspection call for parking shade footings spread footings south of building 2832 three each OK to place concrete |
| 12/12/2023 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Total of ten footing columns for canopy carport. 7 on the west side of building. Last column has a spread footing rebar per plan. 3 on the north side of building. Okay. For concrete placement. 12/12/2023 |
| 12/15/2023 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Total of 8 footing columns for canopy carport. East of the building. Okay for concrete placement in footings. 12/15/2023 |