Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
01/29/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Electrical underground for lighting at canopy’s total of 5 canopy’s. 3/4”conduit at 24” depth (Shade structures). 1/29/2024
05/28/2025 COT - LCBU - Excavation/Rebar/Zoning  Passed
07/31/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 7/21/24 inspection called for parking shade cover footings building 2832 Eastside six structures building 2028 three structures on northside OK to place concrete
08/06/2024 COT - LCBU - Excavation/Rebar/Zoning  Not Ready 8/6/24 inspection call for parking shade footings spread footings south of building 2832 three each OK to place concrete
12/12/2023 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Total of ten footing columns for canopy carport. 7 on the west side of building. Last column has a spread footing rebar per plan. 3 on the north side of building. Okay. For concrete placement. 12/12/2023
12/15/2023 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Total of 8 footing columns for canopy carport. East of the building. Okay for concrete placement in footings. 12/15/2023