Permit: TC-COM-0826-01269
Permit Details
Apply Date:
08/10/2026
Applicant:
Angela Gee
Description:
Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
Permit Reviews
Permit Number - TC-COM-0826-01269
Permit Status: In review
Permit Description: Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2026 | COMMERCIAL REVIEW - FULL v.1 | 09/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0826-01269
Permit Status: In review
Permit Description: Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/31/2026 | Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0826-01269
Permit Status: In review
Permit Description: Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
| Date | Description | Comments |
|---|---|---|
| 08/13/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/13/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0826-01269
Permite Description: Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2026 | N/A | Partial Pass | Okay to pour ramp and landing. Provide edge protection for handrail. | |
| 11/16/2026 | COT - HCBU - Preslab | N/A | Canceled | 11/16/26: canceled. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0826-01269
Permit Description: Tenant improvement to an existing first floor commercial space, including interior non-structural modifications, new partitions, doors and finishes, new exterior door and ramp for accessibility. No change to the existing building footprint or structural system.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2026 | COT - HCEL - Electrical Above Ceiling | Passed | Passed 10/2/26 | |
| 10/02/2026 | COT - HCBU - Framing | Passed | Passed 10/2/26 | |
| 10/02/2026 | COT - HCEL - Electrical Intermediate | Passed | Passed 10/2/26 | |
| 11/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | I met with the Project manager Robert Malin and the concrete subcontractor. They needed confirmation their intention and plan to build a compliant ramp was correct in regard to slope and matching existing concrete to the new concrete. I told them the new concrete ramp and landings poured will need to not exceed 2% crosslope. Where the landing meets the existing adjacent concrete there can be a transition area where it warps to meet the existing. Most of the warp should happen underneath the dog ear at the end of the handrail. Pouring an additional landing area for turning 180 degrees at end of ramp would not be necessary. It would be cost prohibitive due to existing conditions and would call for pouring new curb as well. Schedule sidewalk inspection before pouring ramp and landings. |