Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0826-01269

Parcel: 13216623G


Addresses:

4760 S PARK AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
11/06/2026 PDSD Engineering Division Pre-Construction SITE Passed I met with the Project manager Robert Malin and the concrete subcontractor. They needed confirmation their intention and plan to build a compliant ramp was correct in regard to slope and matching existing concrete to the new concrete. I told them the new concrete ramp and landings poured will need to not exceed 2% crosslope. Where the landing meets the existing adjacent concrete there can be a transition area where it warps to meet the existing. Most of the warp should happen underneath the dog ear at the end of the handrail. Pouring an additional landing area for turning 180 degrees at end of ramp would not be necessary. It would be cost prohibitive due to existing conditions and would call for pouring new curb as well. Schedule sidewalk inspection before pouring ramp and landings.