Permit Details

Status:
In Review
Type:
Commercial Building
Apply Date:
08/03/2026
Applicant:
Andrew Venne
Description:
Interior Remodel

Permit Reviews

Permit Number - TC-COM-0826-01223
Permit Status: In review
Permit Description: Interior Remodel
Start Date Submittal Complete Date Status  
08/06/2026 COMMERCIAL REVIEW - FULL v.1 08/31/2026 REQUIRES RESUBMIT Review Details
09/21/2026 COMMERCIAL REVIEW - FULL v.2 10/06/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0826-01223
Permit Status: In review
Permit Description: Interior Remodel
Total Outstanding Activity Conditions - 2
Date Name
08/26/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
08/26/2026 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0826-01223
Permit Status: In review
Permit Description: Interior Remodel
Date Description Comments
08/06/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/06/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: In Review
Permit Number: TC-COM-0826-01223
Permite Description: Interior Remodel
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/12/2026 COT - LCBU - Framing N/A Partial Pass 11/12/26: framing approved. Use framing inspection to schedule a drywall inspection. Okay to drywall progress areas.

Completed Inspections

Permit Status: In Review
Permit Number: TC-COM-0826-01223
Permit Description: Interior Remodel
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/12/2026 COT - LCEL - Electrical Intermediate Passed 11/12/26: in wall electrical/ under ground conduits verified per plans. Okay to backfill conduit & continue with construction at progress areas.
11/12/2026 COT - LCPL - Plumbing Intermediate Passed 11/12/26: plumbing in wall intermediate approved.
11/12/2026 COT - LCPL - Rough Soil Passed 11/12/26: under ground plumbing verified under test. Okay to backfill progress areas.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-2_A-1 THRU E4 MID STATE MECHANICAL 6223 S PALO VERDE 9-11-26-6223-PALO VERDE-RD_V2.PDF DOCUMENTS VIEW
MIDSTATE MECHANICAL PHM RESPONSES-2026-09-16_V1.PDF DOCUMENTS VIEW