Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/14/2025
Applicant:
KDC Construction
Description:
THE BUILDING IS AN INTERIOR RESTAURANT FIT-OUT IN AN EXISTING OPEN AIR MALL. THE INTENDED USE GROUP IS A-2. NEW STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS ARE PROPOSED. THE EXISTING SHELL BUILDING IS BEING CONSTRUCTED IN 2025 UNDER SEPARATE PERMIT.

Permit Reviews

Permit Number - TC-COM-0825-01534
Permit Status: Complete
Permit Description: THE BUILDING IS AN INTERIOR RESTAURANT FIT-OUT IN AN EXISTING OPEN AIR MALL. THE INTENDED USE GROUP IS A-2. NEW STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS ARE PROPOSED. THE EXISTING SHELL BUILDING IS BEING CONSTRUCTED IN 2025 UNDER SEPARATE PERMIT.
Start Date Submittal Complete Date Status  
08/15/2025 COMMERCIAL REVIEW - FULL v.1 09/08/2025 REQUIRES RESUBMIT Review Details
01/22/2026 ADMINISTRATIVE v.2 01/22/2026 APPROVED Review Details
12/10/2025 COMMERCIAL REVIEW - FULL v.3 12/17/2025 APPROVED Review Details
08/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/06/2026 APPROVED Review Details
12/17/2025 RESTAMP - COMMERCIAL v.1 12/19/2025 APPROVED Review Details
09/25/2025 COMMERCIAL REVIEW - FULL v.2 10/22/2025 REQUIRES RESUBMIT Review Details
07/24/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2026 REQUIRES RESUBMIT Review Details
12/19/2025 ADMINISTRATIVE v.1 12/19/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0825-01534
Permit Status: Complete
Permit Description: THE BUILDING IS AN INTERIOR RESTAURANT FIT-OUT IN AN EXISTING OPEN AIR MALL. THE INTENDED USE GROUP IS A-2. NEW STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS ARE PROPOSED. THE EXISTING SHELL BUILDING IS BEING CONSTRUCTED IN 2025 UNDER SEPARATE PERMIT.
Date Description Comments
12/17/2025 Please contact Pima County Addressing if suite is not available. Addressing@pima.gov or 520-724-9512
09/30/2025 AIR BALANCING REPORT IS REQUIRED.
09/30/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
08/15/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/30/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
08/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/18/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0825-01534
Permite Description: THE BUILDING IS AN INTERIOR RESTAURANT FIT-OUT IN AN EXISTING OPEN AIR MALL. THE INTENDED USE GROUP IS A-2. NEW STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS ARE PROPOSED. THE EXISTING SHELL BUILDING IS BEING CONSTRUCTED IN 2025 UNDER SEPARATE PERMIT.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
COT - FCON - Fire - Final N/A Not Ready
07/17/2026 COT - HCME - Mechanical Final N/A Not Ready
07/17/2026 COT - HCPL - Plumbing Final N/A Not Ready
07/17/2026 COT - HCEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0825-01534
Permit Description: THE BUILDING IS AN INTERIOR RESTAURANT FIT-OUT IN AN EXISTING OPEN AIR MALL. THE INTENDED USE GROUP IS A-2. NEW STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS ARE PROPOSED. THE EXISTING SHELL BUILDING IS BEING CONSTRUCTED IN 2025 UNDER SEPARATE PERMIT.
Total Completed Inspections - 25
Date Description Inspector Results Comments
03/09/2026 COT - HCPL - Rough Soil Passed
03/12/2026 COT - HCBU - Preslab Passed
04/01/2026 COT - HCEL - Electrical Intermediate Passed
04/01/2026 COT - HCBU - Framing Passed
04/06/2026 COT - HCPL - Plumbing Intermediate Passed
05/12/2026 BULD - Electrical Clearance Passed
05/20/2026 COT - BULD - SWG Clearance Passed
05/20/2026 COT - HCBU - Building Above Ceiling Passed
05/20/2026 COT - HCME - Mechanical Intermediate Passed
06/01/2026 COT - HCEL - Electrical Above Ceiling Passed
06/01/2026 COT - HCPL - Plumbing Above Ceiling Passed
06/01/2026 COT - HCME - Mechanical Above Ceiling Passed
07/20/2026 COT - HCME - Venting Passed
07/20/2026 COT - FCON - Hood System - Final Passed
07/20/2026 COT - FCON - Alarm - Final Passed
07/22/2026 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
08/03/2026 COT - FCON - Fire - Final Passed
08/06/2026 COT - HCME - Mechanical Final Passed
08/06/2026 TRSP - ROW - Final/Close-Out Passed Majority of work for this particular TCOMis all inside of one unit of the shell all the work for the right away has been done completed inspected and TCOM completed as well in previous inspections. This is just for all internalbuilding TCOM ALL WE'RE DONE ON PRIVATE PROPERTY NO WORK DONE IN THE RIGHT WAY
08/06/2026 COT - FCON - Sprinkler - Final Passed
08/06/2026 COT - HCPL - Plumbing Final Passed
08/06/2026 COT - HCEL - Electrical Final Passed
08/25/2026 ENGR Engineering Final Passed
08/25/2026 COT - HCBU - Building Final Passed
08/25/2026 COT - HCBU - CofO Passed