Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | ENGR Engineering Final | Not Ready | Dumpster, portapotty, equipment and construction materials need to removed from site. Reschedule when ready. Outstanding Conditions that need to be satisfied prior to final: -Air balancing -All permits with deferred submittals -County health inspection -Water sterilization report |
|
| 07/30/2026 | ENGR Engineering Final | Partial Pass | OK to apply for TCO level 4 pending fire final inspection results. | |
| 08/25/2026 | ENGR Engineering Final | Passed |