Permit: TC-COM-0825-01507
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
7255 E BROADWAY BL UNIT 101
Address NEW:
7255 E BROADWAY BL UNIT 101
Apply Date:
08/11/2025
Applicant:
Nicole Boyd
Description:
Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Permit Reviews
Permit Number - TC-COM-0825-01507
Permit Status: Complete
Permit Description: Rev.1: Started 02/13/2026
EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS.
MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2026 | SPECIAL INSPECTION REVIEW v.1 | 05/15/2026 | APPROVED |
| 05/15/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/20/2026 | APPROVED |
| 08/13/2025 | COMMERCIAL REVIEW - FULL v.1 | 09/08/2025 | REQUIRES RESUBMIT |
| 01/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/23/2026 | APPROVED |
| 06/17/2026 | COMMERCIAL REVIEW - FULL REVISION v.3 | 06/17/2026 | REQUIRES RESUBMIT |
| 01/16/2026 | ADMINISTRATIVE v.2 | 01/16/2026 | REQUIRES RESUBMIT |
| 01/22/2026 | ADMINISTRATIVE v.3 | 01/22/2026 | REQUIRES RESUBMIT |
| 12/15/2025 | RESTAMP - COMMERCIAL v.1 | 12/19/2025 | APPROVED |
| 01/23/2026 | ADMINISTRATIVE v.4 | 01/23/2026 | APPROVED |
| 12/26/2025 | ADMINISTRATIVE v.1 | 12/26/2025 | REQUIRES RESUBMIT |
| 10/30/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/30/2025 | REQUIRES RESUBMIT |
| 02/13/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/11/2026 | REQUIRES RESUBMIT |
| 11/19/2025 | COMMERCIAL REVIEW - FULL v.3 | 12/15/2025 | APPROVED |
| 01/16/2026 | RESTAMP - COMMERCIAL v.1 | 01/22/2026 | APPROVED |
| 05/22/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 06/15/2026 | REQUIRES RESUBMIT |
| 06/17/2026 | COMMERCIAL REVIEW - FULL REVISION v.4 | 06/18/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0825-01507
Permit Status: Complete
Permit Description: Rev.1: Started 02/13/2026
EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS.
MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
| Date | Description | Comments |
|---|---|---|
| 12/19/2025 | Please contact Pima County Addressing if suite is not available. Addressing@pima.gov or 520-724-9512 | |
| 09/04/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 09/04/2025 | COMMISSIONING REPORT IS REQUIRED. | |
| 05/14/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/08/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 05/14/2026 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 09/04/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 09/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/04/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01507
Permite Description: Rev.1: Started 02/13/2026
EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS.
MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2026 | BULD - Electrical Clearance | N/A | Not Applicable | This is NOT an inspection for electrical clearance, this is for drywall. I could not find drywall inspection, so I just chose one at random. all except demising walls. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01507
Permit Description: Rev.1: Started 02/13/2026
EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS.
MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2026 | COT - LCPL - Rough Soil | Passed | ||
| 02/02/2026 | COT - LCBU - Preslab | Passed | ||
| 03/02/2026 | COT - LCBU - Framing | Passed | Passed 3/2/26 ok to insulate and cover | |
| 03/02/2026 | COT - LCEL - Electrical Intermediate | Passed | Passed 3/2/26 ok to insulate and cover | |
| 03/02/2026 | COT - LCPL - Plumbing Intermediate | Passed | Passed 3/2/26 ok to insulate and cover | |
| 03/02/2026 | COT - LCME - Mechanical Intermediate | Passed | Passed 3/2/26 ok to insulate and cover | |
| 03/06/2026 | COT - LCEL - Electrical Underground | Passed | Passed for framing at north wall, site does not have underground electric | |
| 03/16/2026 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 03/23/2026 | COT - BULD - SWG Clearance | Passed | 3/23/26 passed for underground rebar | |
| 05/12/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 05/18/2026 | COT - LCME - Mechanical Final | Passed | ||
| 05/18/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 05/18/2026 | COT - LCEL - Electrical Final | Passed | ||
| 05/18/2026 | ENGR Engineering Final | Passed | Exterior site is good. | |
| 05/18/2026 | COT - LCPL - Sewer | Passed | ||
| 05/19/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/19/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 06/03/2026 | COT - FCON - Alarm - Final | Passed | ||
| 06/15/2026 | COT - HCBU - TCO | Passed | ||
| 06/03/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/15/2026 | COT - LCBU - Building Final | Passed |