Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/11/2025
Applicant:
Nicole Boyd
Description:
Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.

Permit Reviews

Permit Number - TC-COM-0825-01507
Permit Status: Complete
Permit Description: Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Start Date Submittal Complete Date Status  
05/14/2026 SPECIAL INSPECTION REVIEW v.1 05/15/2026 APPROVED Review Details
05/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/20/2026 APPROVED Review Details
08/13/2025 COMMERCIAL REVIEW - FULL v.1 09/08/2025 REQUIRES RESUBMIT Review Details
01/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/23/2026 APPROVED Review Details
06/17/2026 COMMERCIAL REVIEW - FULL REVISION v.3 06/17/2026 REQUIRES RESUBMIT Review Details
01/16/2026 ADMINISTRATIVE v.2 01/16/2026 REQUIRES RESUBMIT Review Details
01/22/2026 ADMINISTRATIVE v.3 01/22/2026 REQUIRES RESUBMIT Review Details
12/15/2025 RESTAMP - COMMERCIAL v.1 12/19/2025 APPROVED Review Details
01/23/2026 ADMINISTRATIVE v.4 01/23/2026 APPROVED Review Details
12/26/2025 ADMINISTRATIVE v.1 12/26/2025 REQUIRES RESUBMIT Review Details
10/30/2025 COMMERCIAL REVIEW - FULL v.2 10/30/2025 REQUIRES RESUBMIT Review Details
02/13/2026 COMMERCIAL REVIEW - FULL REVISION v.1 03/11/2026 REQUIRES RESUBMIT Review Details
11/19/2025 COMMERCIAL REVIEW - FULL v.3 12/15/2025 APPROVED Review Details
01/16/2026 RESTAMP - COMMERCIAL v.1 01/22/2026 APPROVED Review Details
05/22/2026 COMMERCIAL REVIEW - FULL REVISION v.2 06/15/2026 REQUIRES RESUBMIT Review Details
06/17/2026 COMMERCIAL REVIEW - FULL REVISION v.4 06/18/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0825-01507
Permit Status: Complete
Permit Description: Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Date Description Comments
12/19/2025 Please contact Pima County Addressing if suite is not available. Addressing@pima.gov or 520-724-9512
09/04/2025 AIR BALANCING REPORT IS REQUIRED.
09/04/2025 COMMISSIONING REPORT IS REQUIRED.
05/14/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/13/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/08/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
05/14/2026 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/04/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
09/04/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/04/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0825-01507
Permite Description: Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/11/2026 BULD - Electrical Clearance N/A Not Applicable This is NOT an inspection for electrical clearance, this is for drywall. I could not find drywall inspection, so I just chose one at random.

all except demising walls.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0825-01507
Permit Description: Rev.1: Started 02/13/2026 EXISTING TENANT SPACE RENOVATION (FORMERLY A JOANNS FABRIC) INTO A SLIDE PARK. A NEW CONCESSION FOOD SERVICES AREA WITH NEW PREP, EQUIPMENT, LIGHTING, POWER, AND PLUMBING SYSTEMS MODIFIED AND UPDATED. NEWLY RECONFIGURED RESTROOMS. MODIFICATIONS TO SPRINKLER/FIRE ALARM SYSTEM BY A LICENSED SPRINKLER/FIRE ALARM CONTRACTOR UNDER A SEPARATE PERMIT.
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/28/2026 COT - LCPL - Rough Soil Passed
02/02/2026 COT - LCBU - Preslab Passed
03/02/2026 COT - LCBU - Framing Passed Passed 3/2/26 ok to insulate and cover
03/02/2026 COT - LCEL - Electrical Intermediate Passed Passed 3/2/26 ok to insulate and cover
03/02/2026 COT - LCPL - Plumbing Intermediate Passed Passed 3/2/26 ok to insulate and cover
03/02/2026 COT - LCME - Mechanical Intermediate Passed Passed 3/2/26 ok to insulate and cover
03/06/2026 COT - LCEL - Electrical Underground Passed Passed for framing at north wall, site does not have underground electric
03/16/2026 COT - HCBU - Interior Shear Bracing Passed
03/23/2026 COT - BULD - SWG Clearance Passed 3/23/26 passed for underground rebar
05/12/2026 COT - LCEL - Electrical Above Ceiling Passed
05/18/2026 COT - LCME - Mechanical Final Passed
05/18/2026 COT - LCPL - Plumbing Final Passed
05/18/2026 COT - LCEL - Electrical Final Passed
05/18/2026 ENGR Engineering Final Passed Exterior site is good.
05/18/2026 COT - LCPL - Sewer Passed
05/19/2026 TRSP - ROW - Final/Close-Out Passed
05/19/2026 COT - FCON - Sprinkler - Final Passed
06/03/2026 COT - FCON - Alarm - Final Passed
06/15/2026 COT - HCBU - TCO Passed
06/03/2026 COT - FCON - Fire - Final Passed
06/15/2026 COT - LCBU - Building Final Passed