Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
08/29/2024
Applicant:
bao nguyen
Description:
D23AB09/PC79564

Permit Reviews

Permit Number - TC-COM-0824-01696
Permit Status: Inspections
Permit Description: D23AB09/PC79564
Start Date Submittal Complete Date Status  
10/10/2024 RESTAMP - COMMERCIAL v.1 10/10/2024 APPROVED Review Details
09/19/2024 COMMERCIAL FENCE/WALL v.2 10/10/2024 APPROVED Review Details
09/03/2024 COMMERCIAL FENCE/WALL v.1 09/17/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0824-01696
Permit Status: Inspections
Permit Description: D23AB09/PC79564
Total Outstanding Activity Conditions - 4
Date Name
09/17/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR EPOXY AND EXPANSION ANCHORING IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR MASONRY CONSTRUCTION IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR STEEL CONSTRUCTION IS REQUIRED.

Conditions

Permit Number - TC-COM-0824-01696
Permit Status: Inspections
Permit Description: D23AB09/PC79564
Date Description Comments
10/15/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0824-01696
Permite Description: D23AB09/PC79564
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/11/2025 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass OK to place concrete in generator wall water from the small gate to the north west corner
Ok to place concrete on 76' of footer from gate to gate sw corner
South enclosure, north east footer approximately 50 NE corner to west and approximately 200 ft from NE corner to the south on east wall ok to place concrete
2/7/25 along north wall approximately 50' remainder of footer and along east wall to south corner past 2nd pole footer ok to place concrete
3/11/25: Ok to place concrete on south enclosure footing west to east 7 panels to gate (approved by WG)
04/04/2025 COT - LCBU - Masonry Pregrout N/A Partial Pass South wall at top out along with north east wall. Both north walls at entry and north east wall 2nd lift approved. Okay to grout progress areas. 4/4/2025

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0824-01696
Permit Description: D23AB09/PC79564
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/28/2025 COT - LCBU - Excavation/Rebar/Zoning Passed 3-28-25, previously inspected and approved.
08/05/2025 COT - LCBU - Building Final Passed
08/05/2025 ENGR Engineering Final Passed
08/05/2025 SITE - Zoning Final Passed
08/04/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-11105.00 - DMP GENERATION PLANT WALL -IFC PKG_V2_V1.PDF DOCUMENTS VIEW