Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-0824-01696

Inspection Description - COT - LCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/08/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
01/14/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Southwest portion 0f site wall at 0’ - 5’4” (approximately 125’). OK to grout progress areas.
01/31/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
02/07/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
03/11/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass OK to place concrete in generator wall water from the small gate to the north west corner
Ok to place concrete on 76' of footer from gate to gate sw corner
South enclosure, north east footer approximately 50 NE corner to west and approximately 200 ft from NE corner to the south on east wall ok to place concrete
2/7/25 along north wall approximately 50' remainder of footer and along east wall to south corner past 2nd pole footer ok to place concrete
3/11/25: Ok to place concrete on south enclosure footing west to east 7 panels to gate (approved by WG)
03/17/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Transformer/power areas; South and East wall footings at approximately 150’, North wall footing at approximately 50’.
03/19/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass South Generation site, Northwest area footings and caisson footings (22’); approximately 200’ of wall footings. Ok to place concrete in progress areas.
03/28/2025 COT - LCBU - Excavation/Rebar/Zoning  Passed 3-28-25, previously inspected and approved.
12/19/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass