Permit: TC-COM-0824-01670
Permit Details
Apply Date:
08/27/2024
Applicant:
Susan Carlson-Herdt
Description:
Repair to one PV Solar Canopy which was previously permitted: T18CM09638
Permit Reviews
Permit Number - TC-COM-0824-01670
Permit Status: Inspections complete
Permit Description: Repair to one PV Solar Canopy which was previously permitted: T18CM09638
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/17/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 10/01/2024 | APPROVED |
08/29/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 09/12/2024 | REQUIRES RESUBMIT |
10/01/2024 | RESTAMP - COMMERCIAL v.1 | 10/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0824-01670
Permit Status: Inspections complete
Permit Description: Repair to one PV Solar Canopy which was previously permitted: T18CM09638
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
10/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. ( Inspection of Reinforcing Steel and placement of Anchor Bolts |
10/28/2024 | SPECIAL INSPECTION FOR STEEL CONSTRUCTIONIS REQUIRED. 9Welding,Steel Frames, High Strength Bolting, Verification of Snug Tight Bolt installation) |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0824-01670
Permite Description: Repair to one PV Solar Canopy which was previously permitted: T18CM09638
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/8/24: reinforcement per plan at 4 pier footings for Canopy ok for concrete placement. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0824-01670
Permit Description: Repair to one PV Solar Canopy which was previously permitted: T18CM09638
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
12/13/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
12/13/2024 | BULD - Electrical Clearance | Passed | 12-13-24, DGL electrical clearance on Canopy B's inverter #2 for meter #159475297 issued to TEP. | |
12/13/2024 | COT - LCBU - Building Final | Passed | 12-13-24, building final for work/repairs on Canopy B approved. | |
12/13/2024 | COT - LCEL - Electrical Final | Passed | 12-13-24, electrical final/solar approved. | |
12/13/2024 | ENGR Engineering Final | Passed | ||
12/13/2024 | COT - LCBU - Framing | Passed | 12-13-24, framing inspection verified as per approved plans. | |
12/13/2024 | COT - LCEL - Outdoor Lighting | Passed | 12-13-24, outdoor lighting final at Canopy B verified as per plans and is approved. |