Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/23/2024
Applicant:
Joseph Maher
Description:
Existing 2-story complex of existing condos with minor, interior repair & remodeling improvements to be completed, unit 131.

Permit Reviews

Permit Number - TC-COM-0824-01650
Permit Status: Complete
Permit Description: Existing 2-story complex of existing condos with minor, interior repair & remodeling improvements to be completed, unit 131.
Start Date Submittal Complete Date Status  
03/25/2026 SPECIAL INSPECTION REVIEW v.1 N/A APPROVED Review Details
08/23/2024 COMMERCIAL REVIEW - FULL v.1 11/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0824-01650
Permit Status: Complete
Permit Description: Existing 2-story complex of existing condos with minor, interior repair & remodeling improvements to be completed, unit 131.
Date Description Comments
03/26/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01650
Permite Description: Existing 2-story complex of existing condos with minor, interior repair & remodeling improvements to be completed, unit 131.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/12/2024 COT - HCBU - Building Above Ceiling N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01650
Permit Description: Existing 2-story complex of existing condos with minor, interior repair & remodeling improvements to be completed, unit 131.
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/05/2024 ENGR Engineering Final Passed
12/05/2024 COT - HCBU - Preslab Passed Post column footer approved. Okay for concrete placement. 12/5/2024
12/09/2024 COT - HCBU - Framing Passed Rough framing is complete per plans. Okay to proceed with installation of insulation and drywall.
12/26/2024 TRSP - ROW - Final/Close-Out Passed
12/27/2024 COT - HCBU - Building Final Passed