Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
6100 S TUCSON BL
Apply Date:
08/15/2024
Applicant:
Michael Epstein
Description:
Replacing an evaporative cooler with an air conditioner.

Permit Reviews

Permit Number - TC-COM-0824-01607
Permit Status: Inspections
Permit Description: Replacing an evaporative cooler with an air conditioner.
Start Date Submittal Complete Date Status  
08/30/2024 COMMERCIAL REVIEW - FULL v.1 09/05/2024 REQUIRES RESUBMIT Review Details
09/17/2024 COMMERCIAL REVIEW - FULL v.3 09/18/2024 APPROVED Review Details
09/13/2024 COMMERCIAL REVIEW - FULL v.2 09/13/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0824-01607
Permit Status: Inspections
Permit Description: Replacing an evaporative cooler with an air conditioner.
Total Outstanding Activity Conditions - 4
Date Name
08/20/2024 AIR BALANCING REPORT IS REQUIRED.
08/20/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/20/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0824-01607
Permite Description: Replacing an evaporative cooler with an air conditioner.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/22/2024 ENGR Engineering Final N/A Not Ready Once you are finished with all exterior work let's get this rescheduled and we'll meet on site.
11/22/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0824-01607
Permit Description: Replacing an evaporative cooler with an air conditioner.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/23/2024 COT - HCBU - Excavation/Rebar/Zoning Passed 10/22/24: reinforcement per plan at concrete pads ok to proceed with concrete placement.
11/22/2024 TRSP - ROW - Final/Close-Out Passed
11/22/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-08-22-2024_SOUTH HVAC_SET_COMPLETE-SEALED_V3.PDF DOCUMENTS VIEW