Permit: TC-COM-0824-01546
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1120 S HARRISON RD
Address NEW:
1120 S HARRISON RD
Apply Date:
08/07/2024
Applicant:
Catherine Rex
Description:
NO EXTERIOR WORK. CONVERT NON-HANDICAP COMPLIANT RESTROOM INTO A STORAGE ROOM. CONSTRUCT NEW HANDICAP RESTROOM IN PLACE OF HALLWAY CLOSET. ANY FIRE ALARM OR FIRE SPRINKLER WORK UNDER SEPARATE PERMIT.
Permit Reviews
Permit Number - TC-COM-0824-01546
Permit Status: Complete
Permit Description: NO EXTERIOR WORK. CONVERT NON-HANDICAP COMPLIANT RESTROOM
INTO A STORAGE ROOM. CONSTRUCT NEW HANDICAP RESTROOM IN PLACE OF HALLWAY CLOSET.
ANY FIRE ALARM OR FIRE SPRINKLER WORK UNDER SEPARATE PERMIT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 10/09/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01546
Permite Description: NO EXTERIOR WORK. CONVERT NON-HANDICAP COMPLIANT RESTROOM
INTO A STORAGE ROOM. CONSTRUCT NEW HANDICAP RESTROOM IN PLACE OF HALLWAY CLOSET.
ANY FIRE ALARM OR FIRE SPRINKLER WORK UNDER SEPARATE PERMIT.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 01/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/04/2025 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | no sprinkler work was done. |
| 02/04/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable | No fire alarm work was done. |
| 02/04/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | Flush handle needs to be on the accessible side. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01546
Permit Description: NO EXTERIOR WORK. CONVERT NON-HANDICAP COMPLIANT RESTROOM
INTO A STORAGE ROOM. CONSTRUCT NEW HANDICAP RESTROOM IN PLACE OF HALLWAY CLOSET.
ANY FIRE ALARM OR FIRE SPRINKLER WORK UNDER SEPARATE PERMIT.
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | COT - LCPL - Rough Soil | Passed | Underground plumbing for new ADA restroom is complete and connected to main sewer line. Okay to proceed with shading pipe and backfilling/compacting trench for slab pour back. | |
| 01/22/2025 | COT - LCBU - Framing | Passed | ||
| 01/22/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/24/2025 | COT - LCBU - Preslab | Passed | Compaction is complete, rebar dowels are installed in existing concrete slab. Okay to pour back concrete. | |
| 02/04/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/04/2025 | ENGR Engineering Final | Passed | No exterior work was performed, no dumpster, materials or port a jon left. | |
| 02/04/2025 | COT - FCON - Fire - Final | Passed | ||
| 02/04/2025 | COT - LCBU - Building Final | Passed | ||
| 02/04/2025 | COT - LCEL - Electrical Final | Passed | ||
| 02/04/2025 | COT - LCME - Mechanical Final | Passed | ||
| 02/06/2025 | COT - LCPL - Plumbing Final | Passed | 2-6-25, plumbing final approved. |