Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 1/7/25: framing at bathroom per plan ok to proceed. 1/17/25: supports required on vertical and horizontal runs for DWV and domestic water lines, access panel required for S.O.V in ceiling, all plumbing must be pressurized before inspections, nail plates required at any plumbing lines closer than 1 1/4" from face of stud. Plastic grommets required at any plumbing lines penetrating steel studs. |
|
| 01/22/2025 | COT - LCPL - Plumbing Intermediate | Passed |