Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
419 W SPEEDWAY BL
Apply Date:
08/06/2024
Applicant:
Edward Yunkherr
Description:
New commercial building for drive through only coffee/smoothie shop

Permit Reviews

Permit Number - TC-COM-0824-01532
Permit Status: Complete
Permit Description: New commercial building for drive through only coffee/smoothie shop
Start Date Submittal Complete Date Status  
02/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/11/2025 REQUIRES RESUBMIT Review Details
09/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2025 APPROVED Review Details
09/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/09/2025 APPROVED Review Details
12/18/2024 RESTAMP - COMMERCIAL v.1 12/30/2024 APPROVED Review Details
07/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details
02/11/2025 COMMERCIAL REVIEW - FULL REVISION v.1 02/19/2025 APPROVED Review Details
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 REQUIRES RESUBMIT Review Details
08/08/2024 COMMERCIAL REVIEW - LIMITED v.1 11/04/2024 REQUIRES RESUBMIT Review Details
12/02/2024 COMMERCIAL REVIEW - LIMITED v.2 12/05/2024 REQUIRES RESUBMIT Review Details
12/12/2024 COMMERCIAL REVIEW - LIMITED v.3 12/18/2024 APPROVED Review Details
02/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0824-01532
Permit Status: Complete
Permit Description: New commercial building for drive through only coffee/smoothie shop
Date Description Comments
08/08/2024 Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512
12/18/2024 AIR BALANCING REPORT IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/01/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/18/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/18/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01532
Permite Description: New commercial building for drive through only coffee/smoothie shop
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/14/2025 COT - HCPL - Rough Soil N/A Re-inspection required stubbed out five feet from form
04/18/2025 COT - HCPL - Plumbing Roof Drains N/A Re-inspection required Add supports at bends from top of drains. Staples have punctured drains. 4/18/2025
09/29/2025 ENGR Engineering Final N/A Not Ready Contractor needs to finish the basins the landscape and the doors for the trash and enclosure before we can give them the final

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01532
Permit Description: New commercial building for drive through only coffee/smoothie shop
Total Completed Inspections - 26
Date Description Inspector Results Comments
02/25/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
02/25/2025 COT - HCBU - Preslab Passed
03/18/2025 COT - HCBU - Exterior Clips/Sheathing Passed Ok to cover exterior walls.
03/18/2025 COT - HCBU - Framing Passed Interior and exterior framing complete.
03/24/2025 COT - HCBU - Roof Nailing Passed
04/02/2025 COT - HCEL - Electrical Underground Passed
04/18/2025 COT - HCEL - Electrical Intermediate Passed
04/18/2025 COT - HCPL - Plumbing Intermediate Passed
04/22/2025 COT - HCPL - Plumbing Roof Drains Passed
06/06/2025 COT - HCPL - Sewer Passed Grease trap is connected to sewer and u dear hydro test. Ok to cover progress area.
06/26/2025 COT - HCBU - Building Above Ceiling Passed
06/26/2025 COT - HCEL - Electrical Above Ceiling Passed
06/26/2025 COT - HCME - Mechanical Above Ceiling Passed
06/26/2025 COT - HCPL - Plumbing Above Ceiling Passed
07/14/2025 BULD - Electrical Clearance Passed
09/29/2025 COT - FCON - Fire - Final Passed
10/06/2025 TRSP - ROW - Final/Close-Out Passed
09/30/2025 COT - HCBU - Building Final Passed
09/30/2025 COT - HCEL - Electrical Final Passed
09/30/2025 COT - HCEL - Outdoor Lighting Passed
09/30/2025 COT - HCME - Mechanical Final Passed
09/30/2025 COT - HCPL - Plumbing Final Passed
10/01/2025 COT - HCEL - Grounding/Bonding Passed
10/01/2025 COT - HCME - Mechanical Intermediate Passed
10/01/2025 COT - HCPL - Yard Water Line Passed
10/22/2025 ENGR Engineering Final Passed