Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/29/2025 |
ENGR Engineering Final
|
|
Not Ready |
Contractor needs to finish the basins the landscape and the doors for the trash and enclosure before we can give them the final |
| 10/02/2025 |
ENGR Engineering Final
|
|
Partial Pass |
contractor removed part of the patio area that was noncompliant on the slopes. Contractor also is finishing the landscaping. Josh Garcia gave him a level three yesterday which is October 1, 2025 |
| 10/22/2025 |
ENGR Engineering Final
|
|
Passed |
|