Permit: TC-COM-0823-02110
Permit Details
Apply Date:
08/30/2023
Applicant:
Scott Feltheim
Description:
Construction of new athletic fields, basketball courts and associated parking
Permit Reviews
Permit Number - TC-COM-0823-02110
Permit Status: Issued
Permit Description: Construction of new athletic fields, basketball courts and associated parking
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/24/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0823-02110
Permit Status: Issued
Permit Description: Construction of new athletic fields, basketball courts and associated parking
Date | Description | Comments |
---|---|---|
11/02/2023 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-02110
Permite Description: Construction of new athletic fields, basketball courts and associated parking
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | SITE - Zoning Final | N/A | Canceled | |
10/03/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to complete the project per plan before submitting an engineering final. |
09/20/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | Met with representatives from Lloyd construction and from Desert Christian school to look over the area that they are anticipating wanting a TCO for this coming week. We walked this site and I pointed out things that were wrong and would need to be changed or completed correctly in this coming week if they wanted their TCO. Some of the sidewalk they’re planning on using east of the new football field is OK for you, but there is an area that is a driveway into the field that is noncompliant for cross slope at this time. I have advised the school and the contractor that this area will be upon them to choose whether they use it or not due to the noncompliance of sloping grade. Reinspection site will be scheduled for Monday so that we can look at what is being done in the parking lot that they want to use. Pavement will be placed this coming week and should be done and complete by next Friday the 27th. They also schedule another inspection on the 26th to verify that they have completed everything they need to for this event. I have reminded them that all areas were pedestrian. Traffic is adjacent to the particular traffic. Will have to have a 6 inch vertical separation. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-02110
Permit Description: Construction of new athletic fields, basketball courts and associated parking
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2024 | SITE - Zoning Final | Passed | ||
09/30/2024 | COT - FCON - Fire - Final | Passed | ||
09/30/2024 | COT - LCBU - Building Final | Passed | ||
10/02/2024 | TRSP - ROW - Final/Close-Out | Passed |