Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0823-02103
Permit Details
Apply Date:
08/29/2023
Applicant:
Susan Carlson-Herdt
Description:
Install PV Solar canopy 29.16 KW DC 20 KW AC This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185
Permit Reviews
Permit Number - TC-COM-0823-02103
Permit Status: Complete
Permit Description: Install PV Solar canopy 29.16 KW DC 20 KW AC
This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/26/2024 | APPROVED |
01/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/08/2024 | APPROVED |
02/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2024 | APPROVED |
09/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/04/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0823-02103
Permit Status: Complete
Permit Description: Install PV Solar canopy 29.16 KW DC 20 KW AC
This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185
Date | Description | Comments |
---|---|---|
10/03/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
10/03/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
10/03/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
10/03/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
10/03/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
10/03/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02103
Permite Description: Install PV Solar canopy 29.16 KW DC 20 KW AC
This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/13/2023 | COT - CSOL - Electrical Underground Solar Project | N/A | Partial Pass | partial for the electrical risers at canopy A. |
12/05/2023 | COT - CSOL - Grounding/Bonding Solar Project | N/A | Partial Pass | |
12/11/2023 | BULD - Electrical Clearance | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02103
Permit Description: Install PV Solar canopy 29.16 KW DC 20 KW AC
This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/05/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
12/11/2023 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
12/28/2023 | COT - CSOL - Electrical Underground Solar Project | Passed | ok to backfill | |
12/28/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
01/03/2024 | COT - CSOL - Electrical Final Solar Project | Passed | ||
01/03/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
01/03/2024 | COT - LCBU - Building Final | Passed | ||
01/03/2024 | COT - LCEL - Electrical Final | Passed | ||
01/03/2024 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
01/03/2024 | BULD - Electrical Clearance | Passed | ||
01/03/2024 | COT - FCON - Fire - Final | Passed | ||
02/13/2024 | ENGR Engineering Final | Passed | Parking solar structure is actually located at Purple Heart Park which is behind the actual fire station. |