Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-0823-02103
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2024 | ENGR Engineering Final | Not Ready | Project not started yet | |
01/31/2024 | ENGR Engineering Final | Not Ready | No solar structure has been installed to date. Electrical Controls are in place. No one on site to confirm no answer to my calls. | |
02/13/2024 | ENGR Engineering Final | Passed | Parking solar structure is actually located at Purple Heart Park which is behind the actual fire station. |